Horse_Rider
BANNED
- Joined
- Nov 24, 2022
- Messages
- 550
- Reaction score
- 1
- Country
- Location
History repeats itself. I believe J-10C is going to be the Mirage case for the PAF and we'd end up acquiring them in large numbers going forward. The J-10C meets ALL PAF's needs. And if this is our future Mirage case, then smart, long term planning is needed to acquire license production / co-manufacturing in Pakistan today.
We can save billions in cost by producing J-10C local, establish advance industry around latest sensors / airframe, and be worry free by producing both Hi / Lo of the PAF (J-10C and JFT) and integrate anything we need.
Today's investment into acquiring a production line would pay us back twice, once in savings to produce, second, when we get done with producing numbers, the same production line goes to build new variants / upgrades / rebuilt old airframes, etc.