What's new

Pakistan Air Force | News & Discussions.

An LED probe light was installed on top of the right engine intake behind the IFR probe to illuminate both the probe and the drogue from the tanker during night operations. The aircraft is to be supported by PAF Il-78MP tanker. The IFR test was believed to have started in 2017. All Block IIs starting from 16-229 and on will have the IFR probe and probe light installed. The Block II variant is expected to be followed by the much improved Block III.
View attachment 898811

But why only 16-229 onwards? I would have thought the entire fleet of Block II's would be upgraded for IFR. I can get onboard with Block I not being made IFR capable if there was large structural changes to accommodate the IFR etc.
 
.
But why only 16-229 onwards? I would have thought the entire fleet of Block II's would be upgraded for IFR. I can get onboard with Block I not being made IFR capable if there was large structural changes to accommodate the IFR etc.
Good Q?
 
. .
Aerial Refuelling
1668970456510.png
 
. . . . .
. . . . . . .

Country Latest Posts

Back
Top Bottom