Jigs
ELITE MEMBER
- Joined
- Dec 27, 2009
- Messages
- 3,735
- Reaction score
- 0
Cabatli do you have any updated pictures (2010) of our G-Class(OHP) and Meko IIA/B frigates. I am asking because i was wondering if the MK-41 update work has been completed on these ships.
http://www.defenseindustrydaily.com...ch-systems-delivered-supported-updated-02139/
Nov 20/08: Lockheed Martin Maritime Systems and Sensors (MS2) received a $6.3 million modification to a previously awarded contract for design agent engineering services. They will support updated MK 41 Vertical Launch System (VLS) installation in the U.S. Navy’s CG-47 Ticonderoga Class guided missile cruiser modernization program, and the Turkish Navy’s MEKO Track IIA and IIB frigates.
Work will be performed in Baltimore, MD (84% and Ventura, CA (16%), and is expected to be complete by May 2009 (N00024-04-C-5453). See also Lockheed Martin release.
April 4/08: The US Defense Security Cooperation Agency announces [PDF] Turkey’s formal request for 6 MK 41 Vertical Launch System (VLS) Baseline VII tactical modules, and 2 sets of MK 41 VLS upgrade kits. They would be used to modernize 2 MEKO Track IIA frigates and 4 ex-FFG-7 Oliver Hazard Perry Class frigates, and to upgrade 2 MEKO Track IIB frigates’ MK-41 VLS from baseline IV to baseline VII configuration. Updates to the ships’ fire control system upgrades will add RIM-162 Evolved Sea Sparrow Missile capability. Services will include installation and testing, U.S. Government and contractor engineering and logistics personnel services, equipment operation and maintenance, personnel training and training equipment, support and test equipment, spare and repair parts, publications and technical documentation, launch system software development and maintenance and other related elements of logistics support. The estimated cost is $227 million.
http://www.defenseindustrydaily.com...ch-systems-delivered-supported-updated-02139/