Power shortfall surges beyond 6,000 MW

Im an Electrical Engineer with 3 years experience in K-Electric (formerly KESC) in Network Protection department. This department deals with all sections of electricity from generation to transmission to grids and to distribution. Based on my experience and knowledge i have given the statement.

May i know ur expertise by which u have stated my comment as noon league dream?

Heard K-Electric owes a lot of money to SSGC, maybe that is why full generation capacity is not being utilized.
 
.
Way mote than 35billion just look at initial cost of NJ in PPP time and its real cost now
I am.talking g in terms of dollar dear not Pk rs.

As pet wapda estimate the cost of basha was 15 billion Dollar in 2010, and now in 2016 , it has crossed 20 billion dollar.

Dasu dam cost was Rs 8 billion dollar as per 2010 PC1 estimates, which has now around 12 billion dollar.
 
.
N-League is on a mass transit system building spree in the whole country, they can install solar panels over the entire length of the corridors that they are building, that will add a few MWs to the grid.
 
.
Whether we like it or not, Kalla Bagh dam is still the most economical dam with cost of 7 billion dollar and it will complete in least possible time of 5 years.

Whereas for basha as per Wapda estimate it will take 10 Years to complete.
 
.
All these hydro power projects are yet to start.
Dash dam
Bunji dam
Basha dam
Karot dam etc
Non of these projects have started yet.

In case of basha , even purchase of land is still not completed.
All these projects need around 35 billion dollars and will complete some where after 2030
I never said they were going to be completed very quickly but they will provide us with a lot power. There are many more projects as well. Neelum Jhelum dam is expected to be completed by the end of this year.
Neelum-Jhelum-hydel-project.jpg
 
.
Heard K-Electric owes a lot of money to SSGC, maybe that is why full generation capacity is not being utilized.
Yes, there is a circular debt type problem. Govt (sindh) institutions do not pay k-electric, so they do not pay pso and ssgc. Further k-electric itself not utilizing their plants to full capacity bcz of high price/unit of furnace oil.
They have plans for converting them to coal and buy electricity after port qasim coal plants are built
 
.
We are doing fine. Power shortage will be gone by next election
 
. .
Majority of the projects mentioned were not part of cpec we took loans from adb for them ,they were statrted during Musharaf and PPP tenure Nawaz just has a bad habit of claiming other people work for himself
Typical of baboon league
 
. .
I never said they were going to be completed very quickly but they will provide us with a lot power. There are many more projects as well. Neelum Jhelum dam is expected to be completed by the end of this year.
Neelum-Jhelum-hydel-project.jpg
Dear neelum Jhelum is not a dam , its a run of river hydro power project. NJ is under construction for the last 15 years and it is near completion now.
 
.
All things aside, people themselves are involved in electricity theft, here in my neighbourhood the voltage is only 160-180 in peak times because every one has 2 to 3 acs running on kunda and wapda man takes 500-1000 rupees on one kunda, people like me end up paying there theft money by high amount of bills while they enjoy 1000-1500 tier of monthly bill -.-
 
.
umm u guys are talking about the power generation but i have been hearing the infrastructure is not capable enough to sustain more load even if u have surplus power anything is done regarding that
 
.
Im an Electrical Engineer with 3 years experience in K-Electric (formerly KESC) in Network Protection department. This department deals with all sections of electricity from generation to transmission to grids and to distribution. Based on my experience and knowledge i have given the statement.

May i know ur expertise by which u have stated my comment as noon league dream?
Because you said loadshedding will
Im an Electrical Engineer with 3 years experience in K-Electric (formerly KESC) in Network Protection department. This department deals with all sections of electricity from generation to transmission to grids and to distribution. Based on my experience and knowledge i have given the statement.

May i know ur expertise by which u have stated my comment as noon league dream?
What u said before it was been said by noon leaders

For ur kind info this probleum is coming since 1947 no govt have any idea what to do
 
.
Because you said loadshedding will

What u said before it was been said by noon leaders

For ur kind info this probleum is coming since 1947 no govt have any idea what to do
If u have 0.1% idea of all the projects in progress, u would not have said that. Yes ending loadshedding is a dream, but if this govt and next govt continue the progress, it is possible. Dont bcm narrowminded by involving politics in national issues. If NS run and complete projects, i will appraise him, and if next govt do, i will again do same. Idont care whichever idiot is in power!
 
.