Ok so let's count
By Punjab Government
1180 MW Bhikki Power Plant
1223 MW Balloki Power Plant
1230 MW Haveli Bahadur Shah Power Plant
Under CPEC
1230 MW Sahiwal Coal Power Plant
1230 MW Port Qasim Coal Power Plant
880 MW Wind Power project
Various other power projects
969 MW Neelum Jehlum Hydropower Project
147 MW Partind hydropower project
106 MW Golen Gol Hydropower Project
1410 MW Tarbella 4th extension project
680 MW Chashma 3 & 4 Nuclear power plant
400 MW Quaid e Azam Solar Power Plant
425 MW Nandipur power Plant
225 MW Bagasse power plants
I can provide the pictures of each and every project... Also in 2012 Pakistan was generating 10,814 MW while demand was 16,814 MW.
But now in 2018 Pakistan is generating 20000 MW while demand is 22-23K MW and installed capacity has gone up to 29K MW
By Punjab Government
1180 MW Bhikki Power Plant ... Ok
1223 MW Balloki Power Plant ... Not yet completed
1230 MW Haveli Bahadur Shah Power Plant ... Ok
Under CPEC
1230 MW Sahiwal Coal Power Plant ... Ok
1230 MW Port Qasim Coal Power Plant ... Only 615 is operational
880 MW Wind Power project ... From where are you getting this figure ... Even the total installed capacity is lower that the figure you are quoting whereas most of the projects were planned and initiated by PPP and are in sindh ... Totally baseless figure
Various other power projects
969 MW Neelum Jehlum Hydropower Project only 230 is working
147 MW Partind hydropower project ... Started by zardari .. but i can give the credit to pmln ...
106 MW Golen Gol Hydropower Project ... Again started by PPP
1410 MW Tarbella 4th extension project
680 MW Chashma 3 & 4 Nuclear power plant ... Tarbella only 470 MW plant is operational ... Whereas it was planned by PPP
400 MW Quaid e Azam Solar Power Plant ... 400 MW means at max you can have 80 MW as the maximum efficiency is 20%
425 MW Nandipur power Plant ... Who dont know about issues of nandipur aa it requires cpmplete overhauling of the plant
225 MW Bagasse power plants ... I cannot verify these figures but like your other figures these are weak ...
So brother in short ... Brother lots of projects are incomplete ... Lot of hydel and wind projects were started by ppp and as usual pmln are miss quoting the figures ...
Actual generation is much less