killerx
FULL MEMBER
- Joined
- Mar 16, 2007
- Messages
- 1,149
- Reaction score
- 0
JF17 thunder (As of February 2011) under evaluation.FC-1 reported to have passed a design appraisal in December 2009.
Why jf 17thunder still under evaluation by china air fore is is not good enough for china air force
It can replace there F7 which are in large no or it was only built by the for Pakistan air force Pakistan has 34 and china is still testing 4 prototypes
There are many chances that they will induct the block 2 of jf17 thunder as the block 2 would be 4.5 generation and can work perfectly with j10
Why jf 17thunder still under evaluation by china air fore is is not good enough for china air force
It can replace there F7 which are in large no or it was only built by the for Pakistan air force Pakistan has 34 and china is still testing 4 prototypes
There are many chances that they will induct the block 2 of jf17 thunder as the block 2 would be 4.5 generation and can work perfectly with j10