Not much on it. Its shaping up at Kamra along with 16 MR Sqn. Apparently PAF has increased the squadron strength which is causing delay. The good thing is that the financial issues have been sorted out at PAC
Pakher khan baba, when you say that squadron strength has been increased by paf may i ask to what number?.
Block 1 was going to be 50 pieces so that would make 3 squadrons of 16 and 2 extra planes, one has crashed so that leaves 1 extra, so is block 1 going to be manufactured more the 50 pieces to accommodate extra strength of the squadrons?.