Ravager
FULL MEMBER
- Joined
- Aug 22, 2020
- Messages
- 293
- Reaction score
- 0
- Country
- Location
While the money was allready allocated and prepared thing hasn't been spend as yet . So the spec tech requirement could also change . Not to mention plat bender machineries and welding machinery were all general in specs and usages . All those big ticket items spender are jig fixtures and dies were allready changing specs depending on who's stuffs we were ordering as we speak .Sorry to quote your old post @Ravager , but can you explain why we still need those infrastructure and facility if It can only handle DSME 209 manufacturing which (possibly) will be canceled?
Or maybe it can hadle other subs too?