I don't give a fcuk about what you believe. My posts are for other Indians who have this tendency to consider even US retards as geniuses.
Akula has a 32 MW steam turbine in-spite of having a 190 MW reactor, Arihant OTOH has a 70 MW steam turbine in-spite of having a 85 MW reactor.
And THAT makes ALL the different dumb@ss.
The technology used in Akula is from the 1980. BHEL produces Multi stage back pressure Steam Turbines with efficiency of 40% to 50%. so a 70 MW steam Turbine with 47,000 hp rating is a reality in Arihant.
Arihant was designed to be an SSN , it was only much later it was turned into an SSBN which is why the reactor for the Arihant is powerful enough to be used on an SSN.
So your "expert opinion" is just that, a frustrated desire of an American who do not wish to give credit where its due.
Rubbish
India will soon have 2 Aircraft carrier and NO Submarines to defend it.
Only Akula's have the necessary speed of 30+ knots to keep up with the AC fleet. That is till Indian SSN is finished.
THAT and the obvious training opportunity it provides and the need to quickly address falling numbers of submarines.
Arihant has 40% HEU fuel enough for 10-12 years. After which it will come back for refueling and planned upgrade.
LOL..... don't worry about me yank. Your ignorance is not my problem, I just enjoyed the opportunity to trash you and rubbish all your claims. Your frustrated rant is quite enjoyable