rajeev
BANNED
- Joined
- Oct 4, 2009
- Messages
- 503
- Reaction score
- 0
so? LCA is ready for combat deployment? or LCA is now more tested than ever before?
It is out by the time WS engine problem will be figured out.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
so? LCA is ready for combat deployment? or LCA is now more tested than ever before?
It is out by the time WS engine problem will be figured out.
why use kaveri.......
the EJ proposal for thrust vectoring engines is much better don't you think.. although kaveri means our first indigenous engine i think EJ is a better option.
why use kaveri.......
the EJ proposal for thrust vectoring engines is much better don't you think.. although kaveri means our first indigenous engine i think EJ is a better option.
why use kaveri.......
the EJ proposal for thrust vectoring engines is much better don't you think.. although kaveri means our first indigenous engine i think EJ is a better option.
After a series of apprehensions, the indigenously designed ‘Kaveri’ engine, which was meant to power the homegrown ‘Tejas’ Light Combat Aircraft (LCA), is back again in the spotlight as the main contender for the LCA.
India had recently deemed the ‘Kaveri’ engine unfit after its on-going flight tests and was on the verge of finalizing either the Eurojet EJ-200 or the General Electric F-414 engines for the ‘Tejas’ LCA. However, India has made a turnaround in its decision and intends to go in for a powerful version of the ‘Kaveri’ engine to be co-designed by the French firm Snecma.
The cause for this change of plans is due to the skepticism that India has in acquiring the Eurojet or General Electric engines. India feels that Eurojet and General Electric would not be providing India with critical engine technologies despite the mandatory Transfer of Technology (ToT) in the purchase contract. The tender stipulates that 50 per cent of the technology must be transferred to India. However, there are chances that the international firm may not give the critical high-end technology that would be important for India.
Defence Ministry sources indicated that India will now co-develop an engine in India rather than manufacturing one under licence. The state-owned Defence Research and Development Organization (DRDO)’s Gas Turbine and Research Establishment (GTRE), which has a design partnership with French engine-maker, Snecma, has been asked to design a more powerful successor for the ‘Kaveri’ engine.
Minister of State for Defence, Dr Pallam Raju said that the ‘Kaveri’ engine has been underestimated in terms of the benefit it will bring to India. Since large scale research and development has already been invested in the ‘Kaveri’ engine, it will be a waste of time and money to put this in the back-burner. He added that the French firm ‘Snecma’ are willing to go beyond just transfer of technology and since it is a value-added offer, it will give India better technology than what India would get from ToT from Eurojet or General Electric.
Defence Ministry officials feel that India will need to take a crucial decision soon since the ‘Kaveri’ engine has already run into lot of delays and cost-overruns. GTRE is positive that the Snecma-GTRE venture will be fully capable of producing an engine as good as the F-414 and the EJ-200. It will involve improving from the current ‘Kaveri’ engine’s maximum thrust of 65 Kilo Newtons (KN) to the 95 KN that the EJ-200 and F-414 currently have.
India To Revive Kaveri Engine Project | India Defence Online
Is it Indian government want to close this lca project as if Kaveri development start with Snecma the development time atleast 3-4 yr and integration time around 2-3 yr so it mean total time is around 8 yr (so lca mk-II come at time of 2017-2018)for mk-II but IAF need this plane urgently for there old replacement of Mig-21 or they r hoping that they replace with bison in 2020.
Thank u for that information Sudhir.
So it does look like what I was thinking was almost what GOI is in distrust with the amount of tech transfer. which is correct. However I will say if they take this dicision not to select a foreign engine for LCA then it would be another blunder to this already delayed program. and moreover when you know you are buying only 80-90 engines, what the worry on tech transfer. You know that you are developing the Kaveri with Snecma and its not a big deal if you dont get a full TOT on those engines. Just make the birds FLY!!! I hope they dont take such a decision (thinking no decision has been taken and this could be just a thought).
GOI is " DEVELOPING" Our KAVERI yaar..........
That's nothing wrong in it...
As We know that We are Selecting F 18 for MMCA. and so we are going to use GE141 Engine(99) for our LCA Mark-2.
And GOI is just taking stappes towards Self relience for developing Kaveri engine...........
That' s Actually . dont u think?
Dude there is some problem in that report, it is not happening for sure, we might continue development with Kaveri but we will not use it for LCA. I think the projects got delinked long back.
It's a bad news for Kaveri!
Although our WS10A has met problems, we'll still use them on J11B!
Dude there is some problem in that report, it is not happening for sure, we might continue development with Kaveri but we will not use it for LCA. I think the projects got delinked long back.
Applications
Plans are also already under way for derivatives of the Kaveri, including a non-afterburning version for an advanced jet trainer and a high-bypass-ratio turbofan based on the Kaveri core, named as Kabini.
* GTX-35VS Kaveri:
o HAL Tejas (planned for production models)
o HAL Medium Combat Aircraft (conceptual)
o Unmanned Aerial Vehicles
* Derivatives:
o The Indian government plans to adapt and further develop the Kaveri engine design and technology to create a gas-turbine powerplant for armoured fighting vehicles such as the Arjun tank.
o Kaveri Marine Gas Turbine (KMGT), a recently developed derivative of the GTX-35VS Kaveri engine for ships.
Dassault has also offered to fit the Kaveri engine into the Rafale, which, if chosen, which would greatly improve commonality with the Tejas aircraft that will enter service into the IAF