IndianArmy
PROFESSIONAL
- Joined
- May 5, 2010
- Messages
- 3,777
- Reaction score
- 1
radar is the 2nd complex thing after engine in the aircraft which is imported frm israel.
let me tell you your AESA radar timeline
first etst of lCA by 2016 with indegenous AESA radar
after test ther are some problem with radar
2nd test in 2018 bt has some problem again.
3rd test in 2020.it is ready by need some more tests
4th test failure program will sign a deal with israel to solve our problem in the radar
2022 MASHALLAH Indian/israely radar is ready for LCA MK2.
after fitting in the aricraft
oh the radar is out dated
lets start new project
Unlike pakistan, we have wide range and variety of battle radars, India has made AESA radar for Your Kind Information which is Being Used In Our AWACS, and We are also in The process Of Miniaturizing it, and It Might not be used In LCA but in the next project we take up, that is MCA.......
And Kaveri is as Capable as the engine by which JF-17 runs now, But IAF want its Thrust to be Over 92KN, that is Why Kaveri is still not used...
And Please Stop Insulting When Your own country does not have the capability to make engines, radars or Avionics..... India has Made these years ago, but the Only thing is Its not meeting the Standards of IAF....