What's new

HAL Tejas | Updates, News & Discussions-[Thread 2]

. . .
LCA Tejas in dubai

Last pic shows the outclass finishing of Tejas :cheesy::cheesy::dance3::dance3:

And I've seen F-16s with poorer finish in the US.

Your trolling doesn't make any difference to the fact that the overall tolerances on the Tejas are as good as those on most Western fighters. And that it uses the highest percentage of composites in it's skin and airframe.
 
.
Tejas Mk2 has completed it's Critical Design Review in November 2021. HAL is now working on getting the first Tejas Mk2 prototype rolled out by late 2022.

IAF clears Tejas Mk2 design


A major landmark in that evolution was passed on November 15, when the Deputy Chief of Air Staff (DCAS), Air Marshal Narmdeshwar Tiwari, accepted the comprehensive design review (CDR) of the LCA Mark 2.

A CDR is a multi-discipline, technical review that is a critical step in designing an aircraft. It involves examining the air frame design to ascertain that the aircraft is ready for fabrication and testing and it would achieve its stipulated performance within cost, schedule and risk.

The Indian Air Force’s (IAF’s) acceptance of the CDR clears the way for Hindustan Aeronautics Ltd (HAL) to start releasing drawings for fabricating the Mark 2’s first prototype.


Alongside building the Mark 2 prototype, HAL and the Aeronautical Development Agency (ADA) – the Defence Research and Development Organisation (DRDO) agency that oversees the entire Tejas programme – must still resolve a few glitches that remain in the Mark 1 fighter; and also complete delivery of the IAF’s order of 40 Mark 1 (two squadrons) and 83 Mark 1A (four squadrons).

During an exclusive visit to HAL’s Tejas production line in Bengaluru, Business Standard was briefed in detail on the status of the indigenous fighter project. This includes the evolution of the Mark 1 and 1A into the Mark 2; simultaneous development of the navy’s eponymous Twin-Engine Deck Based Fighter (TEDBF) for its aircraft carriers; design and development of the fifth-generation Advanced Medium Combat Aircraft (AMCA), and the development of the Combat Air Teaming System (CATS), a futuristic combination of manned-unmanned aircraft that is the future of air warfare.

The first two Mark 1 squadrons are already operational in Sulur, near Coimbatore. Each of them is authorized 20 fighters, including four twin-seat trainers. The trainers’ specifications were finalised late, so they will be built along with the 16 trainers of the four Mark 1A squadrons.

The IAF has cleared the “final operational certification” (FOC) for the Mark I fighter, even though that involved granting 25 concessions – or performance shortfalls from the IAF’s specified requirements. HAL, ADA and the IAF are working together to resolve these shortfalls.

Twelve issues have already been resolved, the most important one being: Equipping the Tejas to re-fuel in-flight, by day or night. In recent trials at Gwalior, the Tejas proved it could refuel into internal fuel tanks or external drop tanks, from IL-78 refuellers or from Sukhoi-30MKI acting as “buddy refuellers.” This capability is operationally vital, since it effectively increases the range of the Tejas.

Another shortfall that has been resolved is the capability to monitor fuel levels in the Tejas through an integrated Environmental Control and Fuel Management (ECFM) system. This tells the pilot, via a smart multi-function display in the Tejas’ glass cockpit, the fuel level in each of the tanks.

Also being proved is the firing of the Tejas Mark 1’s Gasha 23 mm gun. The gun had been integrated onto the fighter, but live firing was pending. Now butt firing trials and air-to-air firing is being carried out in Nashik.

Waiting to be integrated onto the Tejas is the indigenous Astra air-to-air missile and Safran’s Highly Agile Modular Munition Extended Range (HAMMER) air-to-ground bomb. Towards this, HAL does the mechanical and electrical integration, while the DRDO handles the software and the weapons algorithm.

The 13 shortfalls that still remain include fatigue tests to establish the fighter’s service life span. These tests involve taking an aircraft from the production line and subjecting it to repetitive loading. All combat aircraft are initially released with a designated service life – 500 hours in the case of the LCA. As more and more hours are logged and the data accumulates, the manufacturer increases the designated lifespan proportionately. It takes about nine years of fatigue testing to establish 3,000 hours of service life of the aircraft.

While these capabilities are being tested on the Tejas Mark 1, the Mark 1A is being fitted with an active electronically scanned array (AESA) radar, an electronic warfare (EW) suite that includes a jammer, the Combined Interrogator and Transponder (CIT) – an IFF plus system – and a digital map generator.

The digital map generator, designed by HAL’s MCSR&DC (Mission and Combat Systems R&D Centre), carries the complete map data of the country and neighbouring areas. Depending upon the Tejas’ mission, it extracts the digitised map of the current mission area and transfers it to the pilots’ display, where he can easily access it.

HAL is also integrating the Advanced Short Range Air-to-Air Missile (ASRAAM) onto the Mark 1A. The ASRAAM, which has a range of 60-70 kilometres was bought by the IAF from MBDA UK, for upgrading its Jaguar fighters. Now each Tejas too will carry two of these missiles on its outboard stations.

Another modification involves reshaping the cockpit floor to enable bigger pilots – with shoe size up to 10, which includes 95 per cent of all IAF pilots – to fit into the cockpit and fly the aircraft comfortably.

“The IAF has allotted HAL a Tejas Mark 1, numbered SP-25 (series production aircraft number 25), for integrating these modifications. We are almost through and will start flight testing in December. It will take about two years to complete flight testing, i.e., by end-2023,” said HAL chairman, R Madhavan.

Meanwhile, flight-testing continues. The first Mark 1A is to be delivered in February 2024 with all modifications installed. Since the last Tejas Mark 1 is being completed in the same timeframe, the jigs, fixtures and assembly line used to build the Tejas Mark 1 will be diverted to building the Mark 1A.
 
.
A must watch interview with Commodore Jaideep Maolankar, a former Tejas and LCA Navy test pilot. One of the best in the business, he was associated with the LCA Navy program from it's Project Definition Phase period to the time he landed it on INS Vikramaditya, thus making him the first Indian TP to land an Indian designed and developed airplane (not just fighter) on an aircraft carrier deck. A legend in the Indian TP community, and someone who is just amazing to talk to. Totally inspirational figure.

 
.
Tejas Mk1 LSP taking off for a practice display

FHC_VoAVkAYeeg5


Image credit - Gaur.aviation
LCA Navy Mk1 twin seater (NP-1) with the LEVCON surface deflected.

FFxGjztVgAMv-6V


Image credit - Gaur.aviation
Tejas Mk1 FOC fighter still in primer, with HAL HJT-36 Sitara

FH3aY5QVUAAMHjt


Image credit - Gaur.aviation
 
.
Any news on the Mk. 2? Has construction of the prototype already begun?
 
.
Any news on the Mk. 2? Has construction of the prototype already begun?

It should have. The Critical Design Review was completed on November 15th, so drawings should have been released by now. Plan is for a roll-out by December 2022, followed by ground tests, LSTT, HSTT and then first flight by end 2023.
 
. . .
It should have. The Critical Design Review was completed on November 15th, so drawings should have been released by now. Plan is for a roll-out by December 2022, followed by ground tests, LSTT, HSTT and then first flight by end 2023.
What's the progress on MK1A? Has a functional prototype been rolled out yet? How is it possible that without completion of MK1A project they are moving on to MK2?
 
.
What's the progress on MK1A? Has a functional prototype been rolled out yet? How is it possible that without completion of MK1A project they are moving on to MK2?
Why did they roll out a prototype of Mk1A?
It's not based on any new tech, prototypes only are required for certifying and developing certain techs, like for AMCA. And 200 hours of certification are needed when integrating new subsystems, which can be done on the current LSP.

Even MWF doesn't require a prototype, and only LSPs are planned, which going to require around 2000-3000 hours of certification.
 
.
Why did they roll out a prototype of Mk1A?
It's not based on any new tech, prototypes only are required for certifying and developing certain techs, like for AMCA. And 200 hours of certification are needed when integrating new subsystems, which can be done on the current LSP.

Even MWF doesn't require a prototype, and only LSPs are planned, which going to require around 2000-3000 hours of certification.
So Mk1A is not a major upgrade? JF17 block 3 also required prototypes for testing and validation of new AESA, FCS and related avionics the entire process took about 1 year. How many MK1A have been produced so far? Running multiple projects in parallel is not a concern for IAF? Do they have sufficient manufacturing capabilities to meet project deadlines?
 
.
So Mk1A is not a major upgrade?
Major upgrades don't need a prototype. It needs recertification, which can be done on the existing platform. Even the ELM-2052 flight-tested on LSP way back in 2014.

JF17 block 3 also required prototypes for testing and validation of new AESA, FCS and related avionics the entire process took about 1 year.
Exactly, 200 hours for flight test. If it was a prototype design, it is required at least 4-5 years of flight test (3000 hours).

How many MK1A have been produced so far? Running multiple projects in parallel is not a concern for IAF? Do they have sufficient manufacturing capabilities to meet project deadlines?
No, it doesn't concern IAF, why it concerns them. The R&D teams are entirely different. They even did this during the development of Naval LCA and IAF's LCA. Why does it concern them now? Also Tejas Mk1A is a project of HAL, while Tejas MWF of ADA. I don't know what is parallel about it.
And yes they have enough manufacturing capabilities and Pvt capacity to meet demands. If you want to look into capabilities

 
.

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom