F18 and F16 were bogeymen !If this is true then MoD should be congratulated for its negotiation skills for bring down from $12 Billion to $8.8 Billion.
Further will MoD pursue with F-18s & F-16s offer ?
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
F18 and F16 were bogeymen !If this is true then MoD should be congratulated for its negotiation skills for bring down from $12 Billion to $8.8 Billion.
Further will MoD pursue with F-18s & F-16s offer ?
@PARIKRAMA
Bro you mentioned 300 LCA will be built does this include Indian Navy as well? This is the 1st time I'm hearing a number of 300. What will it include?
Also.....90 Rafales will be built in India, does the contract have an option of 45+ jets as a follow-on order?
Wait, in some report its saying that deal cost 9 billion Euro aka 10.15 billion US dollar, then from where 8.8 billion US dollar figure come from ?
Its what has been discussed. The present LCA orders is just tranche 1. thats for MK1A product.. post that a repeat order will be given for same product line or an improved version based on the development plan results.
Naval ones are touted to be capped at 40-60. Mostly the real naval plane wont be of light category so its more of a technology proof towards AMCA naval variant.
Rafales 90 are tranche 1. There would be more tranches. For the amount we are paying and for the fact that there would be more orders to Merignac line for quicker induction schedules, the numbers needed are much bigger.
with just 90, the MII establishment and cost incurred wont be justified
its a capacity expansion plan not transferring the line..How long is the production line open for within France (given they just have a relatively few number of orders from other countries and are wrapping up their own domestic requirement)? Are we just moving the production line from there to India in essence? It would be advantage for India if so since any future rafale exports to other countries will be sourced from Indian based production line. I wonder if this is on the anvil as part of the future tranches to make them more cost effective/viable.
@Vauban @Taygibay votre opinion SVP
Wasn't the original deal $11 billion for 126 Rafale?
Now it's almost as much ($9 billion) for only 36 Rafale?
That is some serious inflation.
the $11 billion for 126 aircraft was drafted almost 2 decades back, so obviously its inflation
Wasn't the original deal $11 billion for 126 Rafale?
Now it's almost as much ($9 billion) for only 36 Rafale?
That is some serious inflation.
I think rafale needs ti be modified for its operation from iac1,mainly for foldable wings. It will be a coatly affair.its a capacity expansion plan not transferring the line..
Implying Indian line will exist independent of Merignac line which will be there for long long time..
There are markets to cater too via Merignac line.. Even we ourselves may order more from Merignac owing to immediate needs for IN jets.
Only ydy in another forum , a professional called Vstol says IAC1 may sport Rafales.. such a case IAC1 is suppose to come by 2019 and thus a contingent of 42-45 Rafale M cant be build in Indian line and has to be then ordered from Merignac..
Some part of our line will be used for exports but primarily our own order catering would be there as order is big and timelines are set with late production penalty
Is there any chance of lcamk2 flying for iaf?Its what has been discussed. The present LCA orders is just tranche 1. thats for MK1A product.. post that a repeat order will be given for same product line or an improved version based on the development plan results.
Naval ones are touted to be capped at 40-60. Mostly the real naval plane wont be of light category so its more of a technology proof towards AMCA naval variant.
Rafales 90 are tranche 1. There would be more tranches. For the amount we are paying and for the fact that there would be more orders to Merignac line for quicker induction schedules, the numbers needed are much bigger.
with just 90, the MII establishment and cost incurred wont be justified
its 126 aircraft not rafales einsteinTwo decades? The Rafale won the Indian deal in 2012, only a few years ago.
Almost 300% inflation (in the per aircraft costs) for a few years isn't exactly normal.
its 126 aircraft not rafales einstein
Its what has been discussed. The present LCA orders is just tranche 1. thats for MK1A product.. post that a repeat order will be given for same product line or an improved version based on the development plan results.
Naval ones are touted to be capped at 40-60. Mostly the real naval plane wont be of light category so its more of a technology proof towards AMCA naval variant.
Rafales 90 are tranche 1. There would be more tranches. For the amount we are paying and for the fact that there would be more orders to Merignac line for quicker induction schedules, the numbers needed are much bigger.
with just 90, the MII establishment and cost incurred wont be justified
Top back Pic, it is precisely because of the canards that low speeds for carrier landing were achieved.
There are countless documents, written and video, with Dassault people stating the fact.
Good day all, Tay.