Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Thats a Killer guyssss !!! 42? Seriously????? Why
You don't need 42 of these. 18 of it these enough to send any navy shivering.
I smell a scared Indian . And China have not reached 20 055 yet.The calculation is based on a false assumption.USN doesn't have any significant frigates so its only real ships are burke or tico .China has dozens of capable frigates and are a much more closer to shore kind of navy.The existence of large no.of type 54s makes no sense if they need to build 42 055 cruisers.Chinese CBGs will have type 52Ds as well as type 54s.Moreover huge capital ships are vulnerable against submarines and not suitable for solo ASW duty for which Type54 supported by type 56 will be better suited.So a CBG with only 4-5 type 55 cruiser escort is inefficient and weak in ASW.It will be a mix of 1-2 052d,1-2 054a/b,2 055 and nuke sub escorts.
every major navy project was well tested and examed before going for bulk order, 055's initial order was 6 units, I dont know where did you get the idea of "not finished testing" from````most of the subsystems of 055 were well "tested" on 052C, 052D and 054A055 has not finished testing yet. not smart to start mass production yet. China should focus on 055B
Last time I checked the first 055 is not commissioned and still undergoing sea trials.every major navy project was well tested and examed before going for bulk order, 055's initial order was 6 units, I dont know where did you get the idea of "not finished testing" from````most of the subsystems of 055 were well "tested" on 052C, 052D and 054A
sea trial is sea trial, its different, there is no such thing called “testing 055 and going for 055B”````besides, 055A will come before 055B FYI``Last time I checked the first 055 is not commissioned and still undergoing sea trials.
055 has not finished testing yet. not smart to start mass production yet. China should focus on 055B
That's...way too much, even for China. Hopefully they're going to be broken up into different (more advanced) batches.
PLAN is very professional force.sea trial is sea trial, its different, there is no such thing called “testing 055 and going for 055B”````besides, 055A will come before 055B FYI``
and again, the initial order for 055 is 6 (maybe 8), and for such project, the PLAN wont put down the money if it has not finised the tests````