What's new

Why PTI failed in KPK?

Funny, 90% of the sane users here want to say the same thing to you:cool:

You mean InSane butthurt potis, but Zulfikar sound like a troll to me. Probably banned hindu or afghani member.
 
. . .

:rofl: exactly, you will always have unhappy people no matter how good N or PTI work. The trick is to do well every time given opportunity and not destroy your party like PPP have done. Now in punjab/kpk PPP is history no matter how bad PTI/N does.
 
.
Let the election be judge of whether people are pleased with PTI or PMLN or not. It is election that has always changed the fate of Pakistan. Let the people decide in the election.

The problem is that PTI has reputation of not handling well with the result.
 
.
C_yz9vdXYAAUR3v.jpg:large
 
. .
I was thinking about why PTI despite tall claims before election failed to perform in KP?

1. 0MW added to system by PTI lead KP vs 3600MW by punjab government.
...
Don't think. As ur brain lies to you:

Lets see:

Since PTI came in govt in KPK...
ONLY 2 hydral-power added by Punjab -vs- 25 added by KPK.
Calculate the MegaWatts yourself.

1.jpg


=====================================================

Now lets see total Hydro+Thermal provided by Sarhad -vs- Punjab: (not just this govt, also list doesn't include many recent projects from Sarhad, still Sarhad produced more)
Sarhad = 4108 MW
Punjab = 3664 MW(most of which is Thermal - polluting Pakaistan)

Be thankful to Soba Sarhad. We punjabis will die of hunger if Soba-Sarhad stopped giving us power.


1.jpg




These are not PTI projects. Previous government projects completing in PTI term doesn't count.
Another twister.. keep going... and save_ghenda
BTW, where did u come up with the lie that Nooraa's(Punjab) added 3600MW since PTI took over Sarhad???
 
Last edited:
.
Don't think. As ur brain lies to you:

Lets see:

Since PTI came in govt in KPK...
ONLY 2 hydral-power added by Punjab -vs- 25 added by KPK.
Calculate the MegaWatts yourself.

View attachment 396901

These are not PTI projects. Previous government projects completing in PTI term doesn't count.
 
.
These are not PTI projects. Previous government projects completing in PTI term doesn't count.
Where are the projects completing in Punjab by previous Punjab governments? Save baboon as usual
 
.
U mean same thing that pti media wing run by jahangeer tareen is doing against pkj army these days ??? Meaning barking like rabid dogs who need to b put to sleep????
raydar trend google kiya bongi marney sey pehly?

PPP failed but N delivered. Load shedding is about to end in some months and GDP growth rate 6%. But PTI ruled KPK province and they failed to deliver there.
Loadshedding is about to end lol ye manjan kab tak becho gay :D
 
.
People need to realize KPK govt funds controlled by Central govt of PMLn. Also PMLn is heavily utilizing CPEC funds in Punjab development.
 
.
Don't think. As ur brain lies to you:

Lets see:

Since PTI came in govt in KPK...
ONLY 2 hydral-power added by Punjab -vs- 25 added by KPK.
Calculate the MegaWatts yourself.

View attachment 396901

=====================================================

Now lets see total Hydro+Thermal provided by Sarhad -vs- Punjab: (not just this govt, also list doesn't include many recent projects from Sarhad, still Sarhad produced more)
Sarhad = 4108 MW
Punjab = 3664 MW(most of which is Thermal - polluting Pakaistan)

Be thankful to Soba Sarhad. We punjabis will die of hunger if Soba-Sarhad stopped giving us power.


View attachment 396902




Another twister.. keep going... and save_ghenda
BTW, where did u come up with the lie that Nooraa's(Punjab) added 3600MW since PTI took over Sarhad???
Don't think. As ur brain lies to you:

Lets see:

Since PTI came in govt in KPK...
ONLY 2 hydral-power added by Punjab -vs- 25 added by KPK.
Calculate the MegaWatts yourself.

View attachment 396901

=====================================================

Now lets see total Hydro+Thermal provided by Sarhad -vs- Punjab: (not just this govt, also list doesn't include many recent projects from Sarhad, still Sarhad produced more)
Sarhad = 4108 MW
Punjab = 3664 MW(most of which is Thermal - polluting Pakaistan)

Be thankful to Soba Sarhad. We punjabis will die of hunger if Soba-Sarhad stopped giving us power.


View attachment 396902




Another twister.. keep going... and save_ghenda
BTW, where did u come up with the lie that Nooraa's(Punjab) added 3600MW since PTI took over Sarhad???
BB(Baboon Butt) ki vines :D
 
.
People need to realize KPK govt funds controlled by Central govt of PMLn. Also PMLn is heavily utilizing CPEC funds in Punjab development.

bhongiya na maro bhai, only thing PTI/failed at is provincial revenue collection. Not transfers from centre. China don't actually give money for CPEC projects, their companies do the job.
 
.
bhongiya na maro bhai, only thing PTI/failed at is provincial revenue collection. Not transfers from centre. China don't actually give money for CPEC projects, their companies do the job.
mera chanda .... orange line train mansoba is finance through CPEC funds and lot
 
.
Back
Top Bottom