What's new

Turkish Naval Programs

Yes It is... Turkey choosed ESSM because We are an official partner of ESSM program and Roketsan has increadible design-development share coming with those missiles.BTW, I do not think that USA congress will give permission USA institues to export SM-2 missiles for Turkey...

Without SM-2 or a Missile with similar Capabillities TF-2000 would have only limited AAW Capabillities, SAMP-T could be an Alternative for SM-2. It is likely possible in future that Turkey could develop Long - Range AD Missile, but I expect such Missile could be ready after 2020.
 
.
Without SM-2 or a Missile with similar Capabillities TF-2000 would have only limited AAW Capabillities, SAMP-T could be an Alternative for SM-2. It is likely possible in future that Turkey could develop Long - Range AD Missile, but I expect such Missile could be ready after 2020.

Bro, I think Developing a long range missile is completely different story than middile and low level one so We need to take more way to reach such level. At current statues, Prototipes will be operational in 5 years for low altitude, 7 years for medium altitude Vertical launch missiles. Despite Initial requirement has been described for Turkish Land Forces, It is for sure that Turkish Navy will also use those missile for area defence missions...
 
. .
Sahil Güvenlik Komutanlýðý

Turkish Coast Guard 400- 500 Ton Ship Project

Turkish Coast Guard 400- 500 Ton Ship Project is under implementation, in addition to the 1700 ton ships, for the purpose of performing the coast guard missions more effectively in the Exclusive Economic Zone and up to search and rescue borders, under heavy weather conditions. The first one of 8 ships to be constructed under the project is scheduled to be integrated to the inventory in 2014.

Dearsan solution for this program...YTSG
dearsanships.jpg


YTSG will be based on YTKB design
image-3443_4BD20535.jpg
 
.
Dear Cabatli_53
is there anything new about Milgem Sir? almost 1.5 years passed since it was put to sea and we couldnt hear anything else. Also we expect it to be put in to service in 2011.
may be there is a problem with the project? Heard any rumours?

Regards
 
.
Dear Cabatli_53
is there anything new about Milgem Sir? almost 1.5 years passed since it was put to sea and we couldnt hear anything else. Also we expect it to be put in to service in 2011.
may be there is a problem with the project? Heard any rumours?

Regards

Everything goes in accordance with schedule bro. As far as I know, Port trials have already been started and Sea trials will be started in this month...
 
. . .
Sahil Güvenlik Komutanlýðý

Turkish Coast Guard 400- 500 Ton Ship Project

Turkish Coast Guard 400- 500 Ton Ship Project is under implementation, in addition to the 1700 ton ships, for the purpose of performing the coast guard missions more effectively in the Exclusive Economic Zone and up to search and rescue borders, under heavy weather conditions. The first one of 8 ships to be constructed under the project is scheduled to be integrated to the inventory in 2014.

Dearsan solution for this program...YTSG
dearsanships.jpg


YTSG will be based on YTKB design
image-3443_4BD20535.jpg

The coast guard is really getting a good boost.
 
. .
Turkish Defence Industry Executive Commitee results...
1 - The general purpose helicopter project between Agusta and Sikorsky has reached final stage and decision will be announced soon. (It seems Agusta and Sikorsky are playing all their cards and it's getting difficult for SSM to decide and choose one of them)

2 - Chinook deal: FMS agreement will be signed with USA. TAI will be asked about Turkish avionics and subsystems integration.

3 - 9 A-129 choppers will be acquired as a stop-gap.

4 - Low and Medium altitude SAM systems: Design and development contracts will be signed with Aselsan/Roketsan.

5 - New machine gun project: (to replace MG3s etc.) Design and development contracts will be signed with MKEK.

6 - Moship and Ratship: Istanbul Denizcilik company is chosen, talks will start with them.

7 - Indigenous light helicopter project: a light training helicopter for the Land forces will be developed by TAI which will also be used as a commercial helicopter.

8 - Last agreements will be discussed and finalized with USA before placing an order of F-35s in 2011.

http://www.ssm.gov.tr/anasayfa/hizli...ciklamasi.aspx
 
Last edited:
. .
Turkish Defence Industry Executive Commitee results...
1 - The general purpose helicopter project between Agusta and Sikorsky has reached final stage and decision will be announced soon. (It seems Agusta and Sikorsky are playing all their cards and it's getting difficult for SSM to decide and choose one of them)

2 - Chinook deal: FMS agreement will be signed with USA. TAI will be asked about Turkish avionics and subsystems integration.

3 - 9 A-129 choppers will be acquired as a stop-gap.

4 - Low and Medium altitude SAM systems: Design and development contracts will be signed with Aselsan/Roketsan.

5 - New machine gun project: (to replace MG3s etc.) Design and development contracts will be signed with MKEK.

6 - Moship and Ratship: Istanbul Denizcilik company is chosen, talks will start with them.

7 - Indigenous light helicopter project: a light training helicopter for the Land forces will be developed by TAI which will also be used as a commercial helicopter.

8 - Last agreements will be discussed and finalized with USA before placing an order of F-35s in 2011.

http://www.ssm.gov.tr/anasayfa/hizli...ciklamasi.aspx


--------------------------------------------------------



Istanbul Shipyard MOSHIP design (Winner)


RATSHIP Resque and towing vessel

Is this a reaction to the crashed prototype ?
 
.
Is this a reaction to the crashed prototype ?

No bro...Turkey has already been trying to order some second-hand attack helicopters as a stop-gap solution until T-129's join into turkish Army so We clicked the doors of USA many times to order W class Cobra helicopters but They have rejected us.. That's why We have to steer different adresses to order those helos...
 
. .

Pakistan Affairs Latest Posts

Back
Top Bottom