SİLAHDAR
FULL MEMBER
- Joined
- Jun 23, 2017
- Messages
- 447
- Reaction score
- 1
- Country
- Location
I think one is from stm for showing tf-2000 (16 launcher one ) other one is from aselsan for showing çafrad one ship
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
I think one is from stm for showing tf-2000 (16 launcher one ) other one is from aselsan for showing çafrad one ship
If at least 20 of these VLS can carry and fire long range cruise missiles than I really hope Pakistan inducts at least 6 of them
Information: The design of I class has been converted. 5-8 I class frigates will be constructed with that design.
Length:~120m
@TheEagle
View attachment 557480
View attachment 557479
Information: The design of I class has been converted. 5-8 I class frigates will be constructed with that design.
Length:~120m
@TheEagle
View attachment 557480
View attachment 557479
Wow . God I'm coming to you...
Bro source is good ? İf good nice. But why still smart-s mk2 ? Any possible for Çafrad Light
Which VLS will be used at front ???Information: The design of I class has been converted. 5-8 I class frigates will be constructed with that design.
Length:~120m
@TheEagle
View attachment 557480
View attachment 557479
Wow . God I'm coming to you...
Bro source is good ? İf good nice. But why still smart-s mk2 ? Any possible for Çafrad Light
This is quite an immature design at conceptual stage(or even not),noone from navy would be patient to wait a few other years for its completion mate..Information: The design of I class has been converted. 5-8 I class frigates will be constructed with that design.
Length:~120m
@TheEagle
View attachment 557480
View attachment 557479
I am worried if they are going to decide either to replace blocks (assuming steel has subjected high temperatures) and re-build, install all those again. At least a few months delay of the delivery.ece geç saatlerde Tuzla'da inşaası devam eden TCG Anadolu LHD gemimizde ufak çaplı yangın çıkmış. Yangın büyümeden söndürülmüş.
A small fire has erupted aboard #Turkey’s first Light Aircraft Carrier/LHD TCG Anadolu. The blaze was quickly put out but authorities cannot rule our sabotage. The vessel is due to be commissioned in coming months. #NATO #IDEF2019 pic.twitter.com/Exc7F4g5bl
Correction *DzKK and Aselsan, STM doesnt design TF-2000 . Armerkom, or design bureu in Pendik Shipyard does it.I think one is from stm for showing tf-2000 (16 launcher one ) other one is from aselsan for showing çafrad one ship
Being laid before than finalizing design(*due to some political reasons) they had to go slower to produce " surely done" parts earlier to build middle blocks. I guess there are still a few tiny details which is not surely concluded so the production can not throttle to full speed.Can somebody go and ask someone why the I-Class has seen such a slow down if not even a stop of its production? I would really like to know what the reason for it is. Money? Design changes?
Design is still evolving, SSMs are packed and located in rush and covered up ,front CIWS and its platform seems like done in rush either. I dont know why i end up counting 48 VLS instead of others who count 64 ,but looking at the current size of the ship (which is the final dimensions i can say) they can easily fit 80 VLS there.I hope they use Gökdeniz/Korkut-D instead of Phalanx CIWS on TF-2000.