Ismail Demir said after meeting the maritime sector that there were talks about speeding up the maritime defense projects. He said that the expectations are high not only for the needs of Turkey but also for the export projects.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
it was about time...Ismail Demir said after meeting the maritime sector that there were talks about speeding up the maritime defense projects. He said that the expectations are high not only for the needs of Turkey but also for the export projects.
Ismail Demir said after meeting the maritime sector that there were talks about speeding up the maritime defense projects. He said that the expectations are high not only for the needs of Turkey but also for the export projects.
I think the detailed-design phase is about to end. TF2000 can be laying down in 2019.Come on TF 2000
we really need to hear it.
F-110 Spanish Navy Ship.I think the detailed-design phase is about to end. TF2000 can be laying down in 2019.
(Integrated main mast)
(Distributed over Bridge and Mast)
New Recruit
BTW it says "TF2000 Hava Savunma Harbi Muhribi" so it means "TF2000 Air Defence Destroyer" and not a Frigate.
Actually "F" from TF-2000 stands for frigate.First plan was build a frigate but later its converted to destroyer because of high tonnage.
I think the detailed-design phase is about to end. TF2000 can be laying down in 2019.
(Integrated main mast)
(Distributed over Bridge and Mast)
Well before it’s laid down you will have a steel cutting ceremony
And going by previous projects Turkish are not shy to hold first steel cutting ceremony for their ships
So if it happens we will know about it via some media outlet
According to previous timelines final unit of Istanbul class won’t be completed before 2025
They can’t start DDG project until after
But my prediction would be ~2023 ish
In terms of air defense we also must not forget our national Hisar family air/missile defense systems.Countermeasures and ED systems, navigation and other navionic suites, CIWS, national ASM and even torpedo systems will be ready in the very near future .I think there are 3 basic issues that need to be resolved for the start of the TF-2000 AAW project.
1. Çafrad main mast
2. Which air defense system will be choose (SM or Aster)
3. which integrated propulsion system will be choose
2nd, 3rd, and 4th I class frigates ships are planning to build in private shipyards within the STM coordination. So PENDİK ASFAT will probably laid down only first ship (TCG Istanbul).
Pendik Shipyard Turkey's largest shipbuilding center with annual steel processing capacity , technical facilities and its dry docks . So theoretically this shipyard probably uses very few of the infrastructure capacity. Of course, here is an area that requires a expertised, such as military shipbuilding standards and prototype processes, but briefly I would like to say that Pendik Shipyard is much larger than you think.
Dear Mr. Anmdt is not talking about production activities, i think. He reminds us of the difficulties in design-preparation process and supply planning.