Deino
INT'L MOD
- Joined
- Nov 9, 2014
- Messages
- 12,780
- Reaction score
- 22
- Country
- Location
"Aka if not even a WS-10 is ready now, how could it be a WS-15??"
What?
WS-10 has been powering J-10 and J-11 for years, already.
You mean if both Ws-10 and Ws-15 are not ready, it mean only the choice left is AL-31-FN-M2 that is powering J-20 from day one?
Come on ! what's up with You???? .. try to play stupid in order to ignore that argument???
Pupu claims that the J-20 will finally be powered by a WS-10 soon.
That does not mean it does not power the J-11B and J-16 but simply that it does not power the J-20 today.
But if the WS-10 was not tested nor is yet used on the J-20 today, how could the WS-15 be already done??
You see - if Pupu is correct - it immediately killed two contenders and YES, only the AL-31FN-option remains.
Please don't try to divert this argument with nasty side-questions that are irrelevant.
J 20 may have 3 production line mix between Al31 and. Ws15. That produces J20 36 aircraft per year .The forth line will start in 2019 with ws15 with twc. is it true?
Never ! They will never have three line in parallel open producing several different versions. And again the WS-15 won't be ready before 2020; IMO at best 2022.
So that alleged WS-10-powered variant would be at best another interim version after the current ones.
And how do You come up with a fourth line ?? why not 20 line ???
Stay realistic.
Deino