What a lame argument, since I do surely not. But it seems as if some in the Turkish government, society and also here always simply see "red" when something negative is written and often enough the arguments are not discussed but simply turned down with arguments "that is anti-government, this is from Gulen". So for you each argument against the TFX is proof for the "Sun is always red only"!
Anyway, regardless who said or analysed that the timeline is unrealistic and the overall prospects for the TFX are slim at best, physics, engineering and so on do not care about your biased opinion. They depend on facts, even if you don't like them.
And I promise You, Justin Bronk from RUSI who made this assessment is surely not connected to Gulen.
I don’t think timeline is unrealistic. The MMU is inside preliminary design phase to be completed in 2021 but You ask aome solid progress. In this phase, Do not expect much thing out of infrastructure investment, needed tool acquisitions and some design activity news. When It passes into CDR and prototype production phase, You will see many solid advances regarding program.
- Engineering development and preliminary design phase
Schedule:4/5 years
Completion: 2021
- Critical design review and Prototype production/Qualification phase
Schedule: 8 years
Completion: 2029
In this phase:
7 TF-X prototypes will be produced
Roll-out ceremony for first TF-X MMU in 2023.
First flight is expected to be done in 2024/2025
- Serial production phase
Cost: 14 billion $