Well Delivery Time is something which stands out , in otherwise wonderful deal
However , if you consider this
- F22P was manufactured in Pakistan within 1-2 years
- Azmat Class Missile ships which are fairly large ships were also done around 1.5 years per ship for first 3 ships
- OPV done in Romanian Ship yards were done at brisk pace of 1 year or so , western tech
Yes I think so, lets look at the timeline and the best part is we have two shipyards working so the delivery will be fast
1st Jinnah Class at Istanbul shipyard
steel cut 30th Sep 2019
keel was laid 4th of June 2020
launch 2024
2nd Jinnah Class at KSEW
steel cut 9th June 2020
and keel laying I would expect Q1 2021
launch 2024
3rd Jinnah Class at Istanbul
steel cut Q1 2021
keel laying Q4 2021
launch 2025
4th Jinnah Class at KSEW
steel cut Q2-3 2021
keel laying Q1 2022
launch 2025
all 4 units in the water by 2025 by which time the 4 x Type 054A/P will be ready too
basically 8 x FFG in next few years all brand new all VLS