Russia clears $11.38 billion for nuclear power plant in Bangladesh

Don't worry mate, we will give our Burmese Brothers more bigger, better & efficient reactors free of cost.......

Let us know if you want a nuclear submarine on lease from Russia.....we are in negotiations for one of the Akulas, Russians will surely not object to lease one more as India is brother of Russia & brother of brother is the brother in law.......
:rofl:
 
.
1200 X 2 reactors.
It is the total cost of the power plants not only the reactors. That include nuclear, mechanical, electrical, distribution, safety, water treatement, training and operating.
i also mentioned two 1200MW plants dear! That still is ridiculously high. About 4 times higher than normal. I am sure there is some confusion.
 
. .
i also mentioned two 1200MW plants dear! That still is ridiculously high. About 4 times higher than normal. I am sure there is some confusion.
Thats 2400 MW not 1200 MW

You are clearly JEALOUS of the friendship that Burma-India have.........

Our friendship generates more power than your $12 billion reactors & it is free of cost!!!

@Aung Zaya

You mean BD is dying for friendship with India.. :enjoy:
 
.
Thats 2400 MW not 1200 MW



You mean BD is dying for friendship with India.. :enjoy:
ooohh bahiii
LOLZZZZ
i know what two plants of 1200MQ each will produce :omghaha: I know it is a total of 2400MW, that is twenty four hundred MW, or two thousand four hundred MW. What i said about cost is after knowing what the plant capacity is. Do not worry, i am not one who will just jump up to criticism something. Neither am i doing so here, i honestly believe that there is some error or confusion in this report. The amount mentioned is not even near to what it should have been for these two plants.
 
.
ooohh bahiii
LOLZZZZ
i know what two plants of 1200MQ each will produce :omghaha: I know it is a total of 2400MW, that is twenty four hundred MW, or two thousand four hundred MW. What i said about cost is after knowing what the plant capacity is. Do not worry, i am not one who will just jump up to criticism something. Neither am i doing so here, i honestly believe that there is some error or confusion in this report. The amount mentioned is not even near to what it should have been for these two plants.

I understand your point. Russian and BD expert also anticipated around 4 billion dollar. But after feasibility study for 2 years they came up with the final costing. As far as we know that the cost increased due to the structure of the soil and non availability of the water from Ganges river. Also the latest safety features added a huge chunk of the cost.
 
.
I have a free mind and am a free thinker. At the moment I have no party affiliation. This is why I do not side with the party line. I am here to endorse anything good of the ruling or opposition party. I think BNP has been kicked out forever. This what is your thinking also, isn't it?

Yes BNP is gone, but not permanently. They will come back stronger. Because the "nationalist " ideology they follow wont lose its appeal.

If BNP is gone, someone else will try to form a party to fill the void on nationalist ideology. Look at AKP and erdogan, they were nobody 20 years ago.
 
.
I understand your point. Russian and BD expert also anticipated around 4 billion dollar. But after feasibility study for 2 years they came up with the final costing. As far as we know that the cost increased due to the structure of the soil and non availability of the water from Ganges river. Also the latest safety features added a huge chunk of the cost.
It increased to almost 5 times then! 4 billion to 5 billion US$ is what it should be costing but now this particular reports is suggesting 11.38 billion US$ and around 12 Billion takka! That is TOO much and that is why i said that there must be some confusion in reporting.
 
.
It increased to almost 5 times then! 4 billion to 5 billion US$ is what it should be costing but now this particular reports is suggesting 11.38 billion US$ and around 12 Billion takka! That is TOO much and that is why i said that there must be some confusion in reporting.
Reporting is fine 12 billion dollar is the final cost of which 11.38 billion dollar will come from Russian credit.
 
.
It increased to almost 5 times then! 4 billion to 5 billion US$ is what it should be costing but now this particular reports is suggesting 11.38 billion US$ and around 12 Billion takka! That is TOO much and that is why i said that there must be some confusion in reporting.

There is no confusion. We are a corrupted nation. Our leaders will ofcourse bag 25% of any project. However There will be no negligence in the plant as we are densely populated. What if the entire facility has a mega anti earth quake system? We cant take any chance.

@Arsalan

Russia said it would loan $25 billion to Egypt to begin building the first nuclear power plant in Egypt.

The loan is expected to cover 85 percent of the costs and Egypt will ahve to cover the remaining 15 percent, according to Russian Times.

Source: https://defence.pk/threads/russia-t...1st-nuclear-power-plant.411396/#ixzz4EwqcjOxQ


According to this 25B $ only covers 80% of a nuclear plant.
 
.
There is no confusion. We are a corrupted nation. Our leaders will ofcourse bag 25% of any project. However There will be no negligence in the plant as we are densely populated. What if the entire facility has a mega anti earth quake system? We cant take any chance.

@Arsalan

Russia said it would loan $25 billion to Egypt to begin building the first nuclear power plant in Egypt.

The loan is expected to cover 85 percent of the costs and Egypt will ahve to cover the remaining 15 percent, according to Russian Times.

Source: https://defence.pk/threads/russia-t...1st-nuclear-power-plant.411396/#ixzz4EwqcjOxQ


According to this 25B $ only covers 80% of a nuclear plant.
It is more like 400% off in this case

Russia clears $11.38 billion for nuclear power plant in Bangladesh
News Desk, bdnews24.com

Published: 2016-07-19 16:21:26.0 BdST Updated: 2016-07-19 16:24:21.0 BdST
  • 7.jpg
Russia has approved the deal to provide Bangladesh a $11.38 billion loan for the Rooppur nuclear power plant.

RT News reported that the Russian government cleared the deal on Monday. Bangladesh government will finance the rest of the project, which will cost Tk 12.65 billion to build two plants of 1200 MW each. On Jun 27, the Bangladesh government gave its go-ahead for the loan deal.

The repayment period will be 30 years with a 10-year grace period. Bangladesh will have to start yearly repayments in March 2027, the cabinet secretary had said. The annual interest rate will be below 4 percent.

The government expects the first unit of the plant, having a 50-year lifespan, to be commissioned in 2021.
It says Russia to provide 11.38 Billions Dollar and Bangladesh to provide rest of the 12.65 Billion Dollar. Now are you suggesting that the total project cost in 12.65 Billion takka and Russian are providing 11.38 and still there is something that the Bangladeshi government will be contributing? What exactly is the going exchange rate of Takka and US$? :P It cant be one or anywhere near 1.

Dear, there is something wrong in this report, these cost do not make any sense at all.
 
.
She won unopposed because the opposition was too scared to fight her, Queen Hasina indeed!
No, you are completely wrong on this point. BNP wanted back the Caretaker govt, under whose neutral supervision election could be conducted. Your Hasina Begum is afraid of getting down from her chair. To your eyes she is a queen, but, how long? An impartial election must be held sooner or later.
 
.
It says Russia to provide 11.38 Billions Dollar and Bangladesh to provide rest of the 12.65 Billion Dollar. Now are you suggesting that the total project cost in 12.65 Billion takka and Russian are providing 11.38 and still there is something that the Bangladeshi government will be contributing? What exactly is the going exchange rate of Takka and US$? :P It cant be one or anywhere near 1.

Dear, there is something wrong in this report, these cost do not make any sense at all.

The sentence is constructed poorly -

'Bangladesh provide rest of the $12.65' - means, the outstanding amount after taking away the Russian loan of $11.38.

No, you are completely wrong on this point. BNP wanted back the Caretaker govt, under whose neutral supervision election could be conducted. Your Hasina Begum is afraid of getting down from her chair. To your eyes she is a queen, but, how long? An impartial election must be held sooner or later.
And Khaleda Begum gave up her chair willingly? We haven't forgotten her fake voter list? The solo election she held and thought she could ride out - but then the administration went against her and she finally had to relent.

So save us the BS about neutrality...honesty and democracy.
 
.
The sentence is constructed poorly -

'Bangladesh provide rest of the $12.65' - means, the outstanding amount after taking away the Russian loan of $11.38.
It says 12.65 billion takka!!
What else u need to pay after 11.37 Billion loan if total cots in 12.65 Takka? In fact, if it is 12.65 takka why take loan that is about 4 time more than what will be required?
As being repeatedly said to no avail, there is some stupid mistake here.
 
.
He is talking about Kudankulam nuclear power plant.
https://en.m.wikipedia.org/wiki/Kudankulam_Nuclear_Power_Plant
Since deal was signed around 14 years back so the low cost. Anyway we signed another deal with Russia for 2 more reactors on the same site which cost us ~6 billion USD in 2014( almost double than what we paid for same in 2002).
What is the target production of power in the new plant and has the deal been already signed? A delaying will cause the expenses to go up. Below is the model of Rooppur power plant.

rooppur%20nuke%20plant%202_38776.jpg
 
Last edited:
.