HAIDER
ELITE MEMBER
- Joined
- May 21, 2006
- Messages
- 33,771
- Reaction score
- 14
- Country
- Location
This need to be resolved or disarm all groups. Or give all groups deadline, after that ..... my way or highway .. PA should adopt.Tal-Parachinar road was the main area of conflict and remains. The 4000 strong Pakistan army operation koh e sufaid freed it from Chamkani control.
the situation may get back to 2011.
But, Pak-Afghan border should be fully shotdown. Zero movement.