ejaz007
SENIOR MEMBER
- Joined
- Jul 25, 2007
- Messages
- 6,533
- Reaction score
- 1
- Country
- Location
U-214 is technologically superior to Agosta and if available should be procured. If these subs come with complete TOT then that is great. Alternately PN can ask Germans to built one in Germany and assemble the rest in Pakistan so that Pakistani technicians and officers are involved and gain experience of the type.
As far as sanctions are concerned I doubt these have the same type of affect as in the case of say fighters. PN can easily maintain stock of items identified as critical for subs and can develop in house expertise for the repair and maintainence of the vessels. At the time of signing of contract it be made mandatory that Germans shall provide technical training to the Pakistanis so that they can perform maintenance of the subs.
French Merlin sub is still in design phase and due to urgent requirement of PN is not an ideal candidate. The sub may be evaluated at a later stage when PN plans to replace or induct more subs.
As far as sanctions are concerned I doubt these have the same type of affect as in the case of say fighters. PN can easily maintain stock of items identified as critical for subs and can develop in house expertise for the repair and maintainence of the vessels. At the time of signing of contract it be made mandatory that Germans shall provide technical training to the Pakistanis so that they can perform maintenance of the subs.
French Merlin sub is still in design phase and due to urgent requirement of PN is not an ideal candidate. The sub may be evaluated at a later stage when PN plans to replace or induct more subs.