HRK
PDF THINK TANK: CONSULTANT
- Joined
- Sep 24, 2010
- Messages
- 14,108
- Reaction score
- 122
- Country
- Location
Don't Planes have trials ? like Ships and Subs do ? even after they are complete they still have to went for a sea trials for a long time before fully operational , does it happen with Planes too ?
each JF-17 at final testing station remain for testing & evaluation of all the subsystems at ground for at least 20 to 25 days after that it handed over to PAF Flying T&E squadron before the official induction into PAF
thanks sir.
just drop this 'Sir' thing we all are equal ....