Not before 2018... Only 4 block 2 have been constructed 46 more will take at least till 2018 to complete. On top of that finalisation and testing of block 3 will also requir time.
May also include dedicated hard point for carrying various pods.
AESA Confirmed
HMD/HMS confirmed
IRST probable
What else??
May also include dedicated hard point for carrying various pods.