What's new

PAF to induct JF17 Thunder Block III in 2016

Not before 2018... Only 4 block 2 have been constructed 46 more will take at least till 2018 to complete. On top of that finalisation and testing of block 3 will also requir time.

AESA Confirmed
HMD/HMS confirmed
IRST probable

What else??

May also include dedicated hard point for carrying various pods.
 
JF-17 Block-III Fighter to be inducted in PAF fleet in 2016


The Block III version will have Dual Seat cockpit option. There is also a significant change in the engine and very advanced avionics in the Block-III.


The Block III version will also enable pilots to see all required data on the helmet-screen


JF-17 Block-III Fighter to be inducted in PAF fleet in 2016 | The News Tribe
 
Last edited:
Stupid journalists .. It's BLK II that will be inducted next year...


As for the HMD ... Just recently a few days back PAF officials visited South Africa.. (They had been showing interest in the SA HMD since long)... Apart from the A darter rumours!


Context the dots!

http://www.pac.org.pk/news[url="http://www.pstimes.com/2015/04/04/rana-tanvir-discusses-defence-productions-options-with-south-africa/"]Rana Tanvir discusses Defence Productions options with South Africa - Pakistan State Times[/URL]

Cobra HMD:

image.jpg
 
Last few days back geo was showing an old video of Mirages and describing it JF-17's are taking part in Paris air show. They either don't know shit about fighters or they just make joke with the people of Pakistan
Agree, usually local newspapers do not know shit about military equipment .etc. Probably do not have a dedicated military journalist/analyst on board. An opportunity for some of you young military enthusiasts.
 
Stupid journalists .. It's BLK II
Article says significant change in engine , But there are no plans of chinese engine in BLOCKII. So it should be Block III.
Induction date of 2016 is exaggerated but it is not impossible to build one fighter within year and within little changes.
No news of Extra RAM coating in BLOCKIII. ....and it may be without AESA radar , but we are heading towards Block IV in 2018-2019.
 
Article says significant change in engine , But there are no plans of chinese engine in BLOCKII. So it must be Block III.
Induction date of 2016 is exaggerated but it is not impossible to build one fighter within year and within little changes.
No news of Extra RAM coating in BLOCKIII. ....and it may be without AESA radar , but we are heading towards Block IV in 2018-2019.



A twin seater BLKII variant is under development ... Meanwhile we still haven't inducted BLKII yet.. Whose manufacturing started this year...


So makes no sense...


Apart from that BLKIII will be equipped with an AESA or PESA,IRST etc...


The discription provided here is exactly what we know about BLKII and not BLKIII...

Block 2 JF-17 makes first flight ahead of Block 3 improvements - IHS Jane's 360
 
if we look at previous info, Blk 3 prototype was suppose to hit the sky in 2016 and so was twin seater variant. It seems that reporter mixed first flight of prototype with induction
 

Latest posts

Pakistan Affairs Latest Posts

Back
Top Bottom