maverick2009
BANNED
- Joined
- Mar 28, 2009
- Messages
- 416
- Reaction score
- 0
The MRCA saga continues at a Snails pace. With Selection to be made between Summer 2009 and Autumn 2010 The First MRCA will not arrive until 2012. Thereafter an indian built MRCA will not arrive until 2014. These dates could yet slip even further knowing how india debates and works so painfully slowly. eg Goskhov Saga.
Meantime the Russian PAK FA to which india has assigned itself is due for flight Next Year. Albeit just a prototype meaning a fully fledged fighter won,t arrive until a decade of hardwork and over $10 billion of investment from both india & Russia. ie 2020 earliest.
On top of this we have the LCA project coming up to 1100 flights and ready for serious weapons testing but serious issues with engine and weight but a very promising show at aero india 2009.
LCA 2 has been suggested as the final OPRERATIONAL fighter eventually acheving the parameters that IAF wants and it seems alot of this mk2 wil include MRCA type technology ie Possible F414 or EJ200 engine and new redesigned undercarriage via EADS of Europe to help with weight isues. Radar options are also promising with both Israeli Elta & 2052 and earlier 2032 on the drawing board.
IT seems to me that india has itself too many options all in the same time frame. ie 2010 to 2010 india cannot afford all 3. options one of these has to be dropped. Since PAK FA is a FIFTH generation fighter and more long term with india long term strategic ally surely it has be either LCA or MRCA....THAT BITES THE THE BULLET....
From my neutral veiw point i would drop this MRCA deal. india will save a staggering $10 bilion.. This should be spent as follows...
1. $4 billion on upgrade of mirage 2000H to dash 9 & buy another 50 mirage2000 from UAE or France = 100 fighters...
2. $5 billion on PAK FA investment with Russians to enter service in 2020. By dropping MRCA india will retain Russia has its most trusted ally.
3. $3 billion on finishing the LCA MK2 with EADS typhoon Engine/ new undercarriage and Israeli Radar. To induct 100 fighters at unit price of under $30m each. the net result would be by 2020
230 su30 mki
100 mirage 2000 dash 9
100 LCA tejas mk1/2
100 upgraded jaguar
60 mig29 smt
590 planes
150 +PAK FA to follow to replace both mig29/ jaguar/ over 2020-2030 time frame
Surely this is a more managable option and in deed realistic in terms of cost and upheaveal to Air force
Meantime the Russian PAK FA to which india has assigned itself is due for flight Next Year. Albeit just a prototype meaning a fully fledged fighter won,t arrive until a decade of hardwork and over $10 billion of investment from both india & Russia. ie 2020 earliest.
On top of this we have the LCA project coming up to 1100 flights and ready for serious weapons testing but serious issues with engine and weight but a very promising show at aero india 2009.
LCA 2 has been suggested as the final OPRERATIONAL fighter eventually acheving the parameters that IAF wants and it seems alot of this mk2 wil include MRCA type technology ie Possible F414 or EJ200 engine and new redesigned undercarriage via EADS of Europe to help with weight isues. Radar options are also promising with both Israeli Elta & 2052 and earlier 2032 on the drawing board.
IT seems to me that india has itself too many options all in the same time frame. ie 2010 to 2010 india cannot afford all 3. options one of these has to be dropped. Since PAK FA is a FIFTH generation fighter and more long term with india long term strategic ally surely it has be either LCA or MRCA....THAT BITES THE THE BULLET....
From my neutral veiw point i would drop this MRCA deal. india will save a staggering $10 bilion.. This should be spent as follows...
1. $4 billion on upgrade of mirage 2000H to dash 9 & buy another 50 mirage2000 from UAE or France = 100 fighters...
2. $5 billion on PAK FA investment with Russians to enter service in 2020. By dropping MRCA india will retain Russia has its most trusted ally.
3. $3 billion on finishing the LCA MK2 with EADS typhoon Engine/ new undercarriage and Israeli Radar. To induct 100 fighters at unit price of under $30m each. the net result would be by 2020
230 su30 mki
100 mirage 2000 dash 9
100 LCA tejas mk1/2
100 upgraded jaguar
60 mig29 smt
590 planes
150 +PAK FA to follow to replace both mig29/ jaguar/ over 2020-2030 time frame
Surely this is a more managable option and in deed realistic in terms of cost and upheaveal to Air force