Jazzbot
ELITE MEMBER
- Joined
- Apr 27, 2010
- Messages
- 10,382
- Reaction score
- 14
- Country
- Location
Project Details - Electra Consultants it started in 2009 and has nothing to do with PTI govt . if KPK govt takes for such a small project 3 years ,
http://www.nepra.org.pk/Licences/Licence Application/Ranolia SHYDO (17 MW).PDF
It is a ADB financed project which has nothing to do with the performance of PTI govt , it started in 2010 and was supposed to be operational in 2014 .now still it is not complete despite 2 years of PTi govt and it is such a small project .
How PTI kpk govt is taking the credit for which it has got no contribution from financing to execution . If it can take 3 years for 16 +2.5 mwatts , it is peanuts as our demand is much more than that . If PTI really wants to do something , first do something and dont try to spread lies .
http://www.nepra.org.pk/Licences/Licence Application/Ranolia SHYDO (17 MW).PDF pls see the report (from page 17 onwards )of sarhad hydel power 2012 , in 2013 4 projects of about 105 mwts , phur , malakand , shishi , reshun were completed , while malachai 2.6 mwatts , renolia 17 mwatts and daral khawar 36 mwatts were inder construction with the funding of ADB , These were already supposed to be completed in 2014 . All the funding from ADB was arranged by previous govt and the execution was done by prevoius govt and has got nothing to do with current pti kpk govt . PTI has not done anything for power generation and has got no significant allocation for energy sector in 15 -16 budget .
These projects were long delayed due to lack of political will by the previous govts. These projects were kick started by current govt.
Brother of Asad Umer Mr. Zubair Chairman privatization Commission challenged KPK government that they not have submitted single feasibility Report in Nepra.(NEPRA is National Electric Power Regulatory Authority )Independent body to regularize the Power Production.
So claims of Asad Umer and Jhangir Tareen are just Accusations!
in Last 24 Months KPK Government not submitted single feasibility report of any power Project, this year they allocated the funds, and after allocation, defiantly they will submit the report in Nepra for Approval, and after that Approval WAPDA will able to purchase the electricity and put the power in National Grid.
Please dont think Pakistani Nation is fool any more.
Similarly, feasibility studies of the fifteen (15) hydro power projects have been completed and execution of 356 mini/micro hydel projects of 10kW-500kW capacity each has been started in Malakand and Hazara Divisions with 20% cost contribution by the community. The feasibility studies of 141 sites have been completed and construction work on 41 projects started. Out of which 20 projects will be completed by the end of July 2015.
Come again..?