maybe Type 56 Corvette ? or type 52's but the latter would cost a huge amount of money.
They I think are danish shipyard order but type/specs is unknown
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
maybe Type 56 Corvette ? or type 52's but the latter would cost a huge amount of money.
4 Type 54P's
4 Milgem
4 F-22P's
2 Damen Class Corvette
4 Azmat Class FAC
It's a nice surface fleet, I would say order 2-4 Type 52's from China after the current Order and Add 2-4 Jinnah Class Frigates along with additional FACs.
They’re not pickup trucks yaar , large ships take time to make and deliver. Especially submarines, this is normal construction time for them, in fact China is making them quicker than other countries would. Timelines were revealed when contracts were signed, first four subs by 2024, second four by 2028, Type 054 in 2022 And 2023, MILGEM in 2024, so on. At least the navy is going somewhere, what I’m waiting for is the LRMPAS to start coming.
So far 0 New Subs Delivered
So far 0 new Milgem Delivered
So far 0 Type 54 Delivered
Slow development cycle but it is getting better no doubt
So far 0 New Subs Delivered
So far 0 new Milgem Delivered
So far 0 Type 54 Delivered
Slow development cycle but it is getting better no doubt
Just focus on jinnah class and build an advance type of azmat.4 Type 54P's
4 Milgem
4 F-22P's
2 Damen Class Corvette
4 Azmat Class FAC
It's a nice surface fleet, I would say order 2-4 Type 52's from China after the current Order and Add 2-4 Jinnah Class Frigates along with additional FACs.
Bigger issue will be man powerThey’re not pickup trucks yaar , large ships take time to make and deliver. Especially submarines, this is normal construction time for them, in fact China is making them quicker than other countries would. Timelines were revealed when contracts were signed, first four subs by 2024, second four by 2028, Type 054 in 2022 And 2023, MILGEM in 2024, so on. At least the navy is going somewhere, what I’m waiting for is the LRMPAS to start coming.
We need to invest in steel, electronics and propulsion too.Just focus on jinnah class and build an advance type of azmat.
This will help local ship building
Refining AZMAT is a need may be we should have a look at the new tiwanies navy missile ship. its about the size of Azmat but has twice as much fire power.
Another option is to develop a larger ship on PMSF kashmir class. Rather than going for type 56
It could be easier to go Electronic and then perhaps Propulsion, steel is going to be very tough. With Electronics, you can enter sub assembly for other big manufacturers such as LG, Samsung etc, at even 1% to 2% market penetration the set-up should justify the cost of set-up. Propulsion you can start with small marine engines for fishing boats etc and move upward, it is going to be slow up hill climb as there may not be enough local demand to justify the set-up.We need to invest in steel, electronics and propulsion too.
the only think azmat really needs is good sensor package and short term air defense systemThis is bigger and more tonnage Paltform plus 40-50 million azmat class vs I am sure they are twice as expensive.
It’s easy to point but this or that but pak a third world nation with how 70 % budget going towards paying debt of last decade plus and buying Everything again on loans is not going to work.
Improve economy first and collect taxes especially from all mafia otherwise no future for pak with all these gizmos
build a shipping industry...It could be easier to go Electronic and then perhaps Propulsion, steel is going to be very tough. With Electronics, you can enter sub assembly for other big manufacturers such as LG, Samsung etc, at even 1% to 2% market penetration the set-up should justify the cost of set-up. Propulsion you can start with small marine engines for fishing boats etc and move upward, it is going to be slow up hill climb as there may not be enough local demand to justify the set-up.
Specialized steel be a tough cookie, hardly enough local demand to justify set-up, other big producers have the market cornered and going against them will be very tough. Pak steel mills seems to be too happy producing construction grade rebars and hardly any appetite for anything else.
Fun thing with Electronics is that you can set-up down stream Circuit Board shops, Transistors, capacitors etc, then the final assembly. QoC should be a must, no cutting corners for quick profit and then a bust forever.
Oh well, just a thought.
=======
Sorry for the long winded write up, that reminds me to write the foot note for certain someone.
PS: I didn't mean to write a thesis on this, however I couldn't pen it all down in 'Cliff Notes.'
the only think azmat really needs is good sensor package and short term air defense system
their can be other variants purely dedicated for antisubmarine role but that role can be left to large ships
build a shipping industry...
govt should establish it sown shipping merchant vessel company
Pakistan is world 5th largest country
demand is there..
there needs to be will