notorious ausiee
FULL MEMBER
New Recruit
- Joined
- Dec 28, 2009
- Messages
- 43
- Reaction score
- 0
1998: Kaveri to be operational in 2001
2001: Kaveri to be flying by 2006
2006: kaveri to run by 2010
2010:Kaveri to be installed by 2018
2018: Kaveri to be built by 2030
2030: Kaveri to be renamed by 2050
Meanwhile, there will be a new Sukhoi T-200 PAKORA flying with an electromagnetic drive .. and kaveri will still be somewhere..
DRDO.. incorrigible.
bro pakistan is still not able to make a 100cc motorbike engine and you are commenting on fighter jet engine common man.. atleast we are trying to do something by our own with our own money and resources.