What's new

Kaveri Engine development

manishmaithani

FULL MEMBER
Joined
Jun 1, 2009
Messages
346
Reaction score
-1
:: Bharat-Rakshak.com - Indian Military News Headlines ::




Kaveri jet engine finally poised for first flight

Ajai Shukla / Bangalore September 7, 2009, 0:49 IST



After 20 years in the making, the Kaveri jet engine will finally take to the skies.













In 1989, Dr Mohana Rao, then a junior technician at the Gas Turbine Research Establishment (GTRE), Bangalore, immersed himself in the ambitious Kaveri programme, which was designing a jet engine for the Tejas Light Combat Aircraft. After pushing the Kaveri through two decades of heartbreak and achievement, Dr Rao is now the Director of GTRE. And his baby, the Kaveri engine, is ready to fly.

This week, a fully built Kaveri engine will be transported to a testing facility outside Moscow called the Gromov Flight Research Institute. Here, a giant IL-76 aircraft will have one of its four engines replaced with a Kaveri. Russian and GTRE experts will then evaluate the Kaveri’s performance while the IL-76 flies.

Before the actual flight tests, Russian experts at Moscow’s Central Institute of Aviation Motors will run ground checks on the Kaveri’s performance, in conditions that simulate altitudes up to 15 kilometers (49,200 feet).

Business Standard visited the Kaveri ground test bed at GTRE, Bangalore, where Russian experts are finishing “pre-acceptance checks” on the Kaveri engine that is headed for their facilities in Russia. The giant turbofan engine, suspended from a ceiling bracket, was being revved up gradually. As it roared to a deafening crescendo, engineers monitored the Kaveri’s power output, watching carefully from behind a bullet-proof glass window.

“The Kaveri’s development is complete”, confirmed Dr Mohana Rao, “In ground testing at GTRE it met the performance parameters laid down in 1998. The next step is to confirm that it performs during flight. A 50-person GTRE team will travel with the engine to Moscow and participate in the flight trials over the next 3-4 months.”

India has no facilities for altitude-testing and flight-testing jet engines. GTRE estimates it will take several hundred crore rupees to create such test facilities in India. Meanwhile, each test campaign in Russia costs Rs 50-60 crores.

For the DRDO (GTRE is a DRDO laboratory) even a successful Kaveri flight will be a bittersweet end to one of India’s most savagely criticised development programmes. A measure of success, on the one hand, in an ambitious technological leapfrog to building a modern jet engine, something only a few countries can do. On the other hand, the Kaveri has failed to provide an engine for the Tejas, even after spending Rs 3000 crores.

“The reason was two-fold”, explains Mohana Rao. “The Kaveri turned out 15% heavier than we planned. From the planned 1100 kg, its final weight has gone up to 1265 kg.”

Meanwhile, the Tejas fighter also turned out heavier than planned, demanding a more powerful engine; the Kaveri’s maximum thrust of 65 Kilo Newtons (KN) is simply not enough. The air force has chosen American GE 404-IN engines, which produce 80 KN at full power, to power the first 20 Tejas fighters. And subsequent Tejas will get about 95 KN of thrust from a new-generation engine: the General Electric GE-414 and the Eurojet EJ200 engines are currently being evaluated.

But GTRE is undeterred, having produced a high-tech turbofan jet engine in a country that has never produced even a motorcycle or car engine.

“We need more thrust without increasing the size of the engine”, says Mohana Rao. “That means getting better technologies from a more experienced foreign partner. We have chosen (French aero-engine major) Snecma. The Defence Ministry has approved the tie-up.”

Business Standard has learned that Rolls Royce, and General Electric declined to partner GTRE, apparently unwilling to part with cutting-edge technology. US major, Pratt & Whitney, was willing only to provide consultancy. With only Russia’s NPO Saturn and Snecma in the game, the MoD has opted for Snecma.
 
Kaveri jet engine finally poised for first flight

After 20 years in the making, the Kaveri jet engine will finally take to the skies.
In 1989, Dr Mohana Rao, then a junior technician at the Gas Turbine Research Establishment (GTRE), Bangalore, immersed himself in the ambitious Kaveri programme, which was designing a jet engine for the Tejas Light Combat Aircraft. After pushing the Kaveri through two decades of heartbreak and achievement, Dr Rao is now the Director of GTRE. And his baby, the Kaveri engine, is ready to fly.

This week, a fully built Kaveri engine will be transported to a testing facility outside Moscow called the Gromov Flight Research Institute. Here, a giant IL-76 aircraft will have one of its four engines replaced with a Kaveri. Russian and GTRE experts will then evaluate the Kaveri’s performance while the IL-76 flies.

Before the actual flight tests, Russian experts at Moscow’s Central Institute of Aviation Motors will run ground checks on the Kaveri’s performance, in conditions that simulate altitudes up to 15 kilometers (49,200 feet).

Business Standard visited the Kaveri ground test bed at GTRE, Bangalore, where Russian experts are finishing “pre-acceptance checks” on the Kaveri engine that is headed for their facilities in Russia. The giant turbofan engine, suspended from a ceiling bracket, was being revved up gradually. As it roared to a deafening crescendo, engineers monitored the Kaveri’s power output, watching carefully from behind a bullet-proof glass window.

“The Kaveri’s development is complete”, confirmed Dr Mohana Rao, “In ground testing at GTRE it met the performance parameters laid down in 1998. The next step is to confirm that it performs during flight. A 50-person GTRE team will travel with the engine to Moscow and participate in the flight trials over the next 3-4 months.”

India has no facilities for altitude-testing and flight-testing jet engines. GTRE estimates it will take several hundred crore rupees to create such test facilities in India. Meanwhile, each test campaign in Russia costs Rs 50-60 crores.

For the DRDO (GTRE is a DRDO laboratory) even a successful Kaveri flight will be a bittersweet end to one of India’s most savagely criticised development programmes. A measure of success, on the one hand, in an ambitious technological leapfrog to building a modern jet engine, something only a few countries can do. On the other hand, the Kaveri has failed to provide an engine for the Tejas, even after spending Rs 3000 crores.

“The reason was two-fold”, explains Mohana Rao. “The Kaveri turned out 15% heavier than we planned. From the planned 1100 kg, its final weight has gone up to 1265 kg.”

Meanwhile, the Tejas fighter also turned out heavier than planned, demanding a more powerful engine; the Kaveri’s maximum thrust of 65 Kilo Newtons (KN) is simply not enough. The air force has chosen American GE 404-IN engines, which produce 80 KN at full power, to power the first 20 Tejas fighters. And subsequent Tejas will get about 95 KN of thrust from a new-generation engine: the General Electric GE-414 and the Eurojet EJ200 engines are currently being evaluated.

But GTRE is undeterred, having produced a high-tech turbofan jet engine in a country that has never produced even a motorcycle or car engine.

“We need more thrust without increasing the size of the engine”, says Mohana Rao. “That means getting better technologies from a more experienced foreign partner. We have chosen (French aero-engine major) Snecma. The Defence Ministry has approved the tie-up.”

Business Standard has learned that Rolls Royce, and General Electric declined to partner GTRE, apparently unwilling to part with cutting-edge technology. US major, Pratt & Whitney, was willing only to provide consultancy. With only Russia’s NPO Saturn and Snecma in the game, the MoD has opted for Snecma.
 
Friends can anyone inform emo-girl to view this thread? i guess yesterday she was alot intrested in 'kaveri' engine. Please inform her if anyone see her here. Thank you.
 
Now she will not be intrested,by the way its a good news for India.
 
[/COLOR]
Friends can anyone inform emo-girl to view this thread? i guess yesterday she was alot intrested in 'kaveri' engine. Please inform her if anyone see her here. Thank you.

I saw this thread the very moment it was posted, thanks for ur concern & Good luck for Kaveri
 
Friends can anyone inform emo-girl to view this thread? i guess yesterday she was alot intrested in 'kaveri' engine. Please inform her if anyone see her here. Thank you.

He/She will only come after news of blast comes due to kaveri engine.
 
Indian hard work will definitely bring good result for india...

Hal is also set to supply su 30 part to russia for su 30 future delivery to other country.
Dhruv is good sucess for hal.
 
Kaveri is just the edje on sensetive technology.As per my views to be developed nation,India needs self dependence on every field.We are almost self dependent on many area of technology but we are not on the level of west, americans and russian.Kaveri development took about 20 years, but only 20 years is nothing for a nation.I am citizen of this nation where india going to developed and after 20 years india will called a developed nation, its my honor to see india being developed.I am sorry but even "BAPU" did not have this honor.

sory for my grammer.
 
Built for air force, Kaveri engine chosen by navy

The indigenous Kaveri aircraft engine, soon to make its debut flight, lacks the muscle needed by India’s Tejas light combat aircraft, which the engine was designed to power. In its present form, the Kaveri will never power a modern fighter.

But the engine’s technology — developed by the Defence R&D Organisation, over two decades, at a cost of Rs 3000 crore — will not be wasted. The Indian Navy is snapping up the Kaveri for powering its growing fleet of warships.

Business Standard has learnt that the navy has officially informed the Gas Turbine and Research Establishment (the DRDO laboratory that developed the Kaveri) that naval warships will needs 40 Kaveri Marine Gas Turbines (KMGTs) over the next 15 years.

In an important signal of its support, the navy has agreed to fund 25 per cent of the cost of the KMGT project.

GTRE has developed the marine Kaveri by modifying the aero engine with a shaft, through which power can be delivered to a propeller. The navy has extensively tested these engines at Visakhapatnam and found that the marine Kaveri can deliver 12 Megawatts (16,000 Horsepower) of propulsion power.

Typically warships run on regular diesel engines; gas turbines (such as the Kaveri) are added on to provide “boost power”, needed for manoeuvring in battle. Contemporary gas turbines, such as the General Electric LM2500, provide India’s latest 5000-tonne Shivalik class frigates with 22 Mw of boost. The Kaveri’s more modest 12 Mw is sufficient only for smaller warships.

While the marine Kaveri’s basic performance has been established (even the PM has seen a demonstration in Visakhapatnam), the GTRE Director, Dr Mohana Rao, is not yet satisfied with the basic design.

“So far, the KMGT is just a spin-off from the aero version”, Rao told Business Standard in Bangalore. “I want to give the navy an engine with far greater endurance. An aero engine’s life is just 3000 hours; a marine engine’s life should be 30,000 hours. I must physically test the KMGT for at least 15,000 hours.”

GTRE is going ahead with developing 3-4 test engines and beginning trials within three years. The trials will be conducted in a marine environment, which will include high humidity, and prolonged exposure to salt.

“We plan to begin delivery in about 6 years”, says the GTRE Director, “We hope to keep the cost below Rs 25-30 crores, which is considerably cheaper than buying imported gas turbines.”

Earlier this year, the US State Department had stopped General Electric from fitting its LM-2500 turbines on the INS Shivalik, apparently because GE had not obtained proper permissions from the US government.

Other than the 40 KMGTs, the Indian Navy has also issued a letter, on 6 th April 09, laying out a requirement for 42 Gas Turbine Generators, or GTGs. These are de-rated versions of the marine Kaveri, which will be used for generating electrical power on warships. Each GTG generates 1.2 Megawatts of power.

The Indian Navy, an enthusiastic proponent of indigenisation, proposes to replace the diesel generators fitted on older warships with the Kaveri GTG. If it performs well over a period of time, the new-generation warships will also get electrical power from the Kaveri GTG. Currently, only the Rajput and Delhi class of destroyers use gas turbines for power generation.
 
Back
Top Bottom