Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
my car leaks more oil than that, nothing to worry
what is with oil mark between stabilizers? We have seen similar on jet performing in Dubai last year.
It seems that PAF is planning only to get 150 JF-17s with 77 F-16s in total. Which means very small force which they were talking about 3-4 years back. I have heard some interviews on TV about that.
"Given the consideration the we intend to go for a new block with enhanced capabilities after 50 airframes, we could easily see a Block 4 or a even a Block 5." - Air Cdre Mahmood Khalid. (reported by Air Force Daily)
So...... 50 (Block-1) already produced and inducted + 50 (Block-2) to be produced and 50 (Block-3) will be produced in future the same way = 150 Airframes.
Now adding 50 (Block-4) and 50 (Block-5) we are easily getting = 250 Airframes. Which means: "150" is not the stop point
Any Block need not have 50 units. It can be more or less than that.
Agreed. But that fairly depends on the Budget the Air Force would be getting. But I still highly doubt that
Right now the indications are that financial constraints will limit the number of units built and deployed. If the economy picks up and more funds are made available, then of course it is another story.
"Given the consideration the we intend to go for a new block with enhanced capabilities after 50 airframes, we could easily see a Block 4 or a even a Block 5." - Air Cdre Mahmood Khalid. (reported by Air Force Daily)
So...... 50 (Block-1) already produced and inducted + 50 (Block-2) to be produced and 50 (Block-3) will be produced in future the same way = 150 Airframes.
Now adding 50 (Block-4) and 50 (Block-5) we are easily getting = 250 Airframes. Which means: "150" is not the stop point
"Given the consideration the we intend to go for a new block with enhanced capabilities after 50 airframes, we could easily see a Block 4 or a even a Block 5." - Air Cdre Mahmood Khalid. (reported by Air Force Daily)
So...... 50 (Block-1) already produced and inducted + 50 (Block-2) to be produced and 50 (Block-3) will be produced in future the same way = 150 Airframes.
Now adding 50 (Block-4) and 50 (Block-5) we are easily getting = 250 Airframes. Which means: "150" is not the stop point
They was I read this, combined with the Dubai presentation that was giving the timeline and the different blocks, is that they confirmed/current plan is for three Block of 50 each.
The Air Cdre then says, “we could easily see a Block 4 or a even a Block 5”. “COULD” puts these as a possibility. “EASILY” says “high probability”. “EVEN” suggests “at a stretch”.
So, my understanding is 150 a solid plans or the minimum they want. Things permitting they could/will try to get another 50 and a final 50.