ghazi52
PDF THINK TANK: ANALYST
- Joined
- Mar 21, 2007
- Messages
- 102,926
- Reaction score
- 106
- Country
- Location
PM Abbasi inaugurated the country’s second Liquefied Natural Gas (LNG) terminal at Port Qasim in Karachi .
The PM noted that the new terminal had been constructed in just 330 days.
Its third LNG terminal at Port Qasim will become operational in 2018, taking the total installed capacity close to 2,000 million cubic feet per day.
The PM noted that the new terminal had been constructed in just 330 days.
Its third LNG terminal at Port Qasim will become operational in 2018, taking the total installed capacity close to 2,000 million cubic feet per day.