What's new

Infrastructure Development in Pakistan

.
TODAY, by the grace of God, the 2nd Unit of Sahiwal coal power project has started running on its full capacity (660-MW) during trial run--and count down for 168 hour testing has now begun ...

In other words, the Sahiwal Coal Power Plant today is operating at its full capacity of 1320MW--both Unit 1 & 2 are generating power of 660 MW each.

18766059_1463352583703343_196805501511559067_n.jpg
 
. .
Hard rock excavation with controlled blasting methods.
Project: Widening and Upgradation of Zhob - Mughal Kot Road National Highway N-50 project of NHA.


19059695_1199839666810396_328950821673907569_n.jpg




19105902_1199839636810399_4486208532730571930_n.jpg




19059078_1199839630143733_7949083885456056427_n.jpg




19247586_1199839783477051_6826963249567339365_n.jpg
 
.
New NADRA Facilitation center in Gulberg Lahore.

This Facilitation Center will be open 24 hours & 7 days a week so No more waiting in long lines, fully air conditioned pleasant environment..

19113824_1198155463645483_5760816947083047190_n.jpg



19146283_1198155466978816_8406747836587581078_n.jpg
 
.
Faisalabad International Airport (LYP/OPFA)

Control Tower and newly constructed apron can be seen behind the FlyDubai Boeing 737.

269b86716e.jpg
 
.
Zamir gul Irrigation dam Kohat KPK.

The under construction Zamir Gul Dam is situated in the remote and far-flung village Ziarat Sheikh Allahdad of Southern District of Kohat on Kohat-Nizampur Road in PK-37. Annual Rainfall in the area is 22%. There is thousands acres barren land but due to no proper canal system its production ratio is nothing. Most lands of Ziarat Sheikh Allahdad are Barani.
The Dam on completion would bring green revolution in the area

19059574_1240191482759700_3084949279160916564_n.jpg
 
. . . .
7euP3L2N2ewWJ3W1lZLtW62NQXi3Q9yS3YIu4W4CKtU.jpg

orange one under construction was suppose to go across the Indus river but PPP forced to build it near Indian border.
PPP has always managed to toy NS, while all advisors of NS are agents of PPP.
 
.
Anyone has an idea about the projected GDP rebase after the census data arrives?
 
. .
11 Development Projects Approved Across Pakistan!


Here is a List of the Projects Approved with the Total Cost of Each.

1. Punjab Irrigated Agriculture Productivity Improvement Project (PIPIPI) – 67.5 Billion

PIPIPI has been designed to maximize the productivity of available water by using the On Farm Water Management (OFWM) technology package which will help curb water losses. This project was approved 5 years ago but abandoned, increasing its cost by 88%.



2. Peshawar Metro Bus – Rs.49.4 Billion

The government has allocated $335 m for the Peshawar Metro Bus project and it has been financed by the Asian Development Bank. It will be complete in a year and citizens of Peshawar will be able to use the facilities within a year. 45O air conditioned buses will be operational, serving about 50,000 passengers daily.

3. Jaglot-Skardu Road – Rs. 32.3 billion

The road will be expanded and is expected to cut down travel times by half after the project is completed. Good news for tourists, no more long queues during the summer vacations. [we hope!]

4. Enhancing Public-Private Partnership – Rs. 19.3 billion

The Ecnec has approved the budget to help complete development projects with private sector cooperation.

5. Koto Hydropower Projects – Rs. 14 billion

The Koto Hydropower projects were previously halted due to political reasons. A Chinese company has taken over the project at 133% increase in cost.

6. Health Services Delivery Project – Overall Cost: Rs. 13.9 billion

The project includes various departments; EPI, MNCH, Family Planning & PHC Programme (LHW Programme) and Nutrition Programme for the provision of primary health care.

7. Thokar Niaz Beg Project – Overall Cost: Rs. 10.4 billion

Expansion and improvement of Canal Road from Thokar Niaz Baig to Defence Road will provide relief to the traffic flowing from Thokar Niaz Baig to Bahria Town.



8. Karachi Neighborhood Improvement Project – Rs. 10.3 billion

Pakistan Chowk, Korangi, Malir, and Saddar areas, including Empress Market, will undergo changes due to congestion and heavy population. The Sindh Government will be receiving aid from the World Bank worth Rs 9 billion and complete the rest of the amount themselves.

9. PM’s Youth Skill Development Programme – Rs. 6.2 billion

Finally, the youth of Pakistan gets some recognition, around 100,000 youngsters will be trained in the fields of construction, energy, production, agriculture, IT and mining.

10. Rathoa Haryam Bridge Construction – Rs. 5.1 billion

The bridge is going to be 5km long and will reduce traveling time between Mirpur and Kotli, as well as Mirpur and Dadayal Subdivision.

11. Children Hospital at Bahawalpur Project – 5.1 billion

First approved in 2015, Rs.750 million was set aside for the hospital. South Korea will now be providing a loan of Rs3.5 million at concessionary rates to construct the 235-bed hospital.
 
.
Rapid Mass Transit System (Orange Line)


19956739_746773525483707_8230302531597894536_o.jpg


19894895_1462780270472700_592978876155473855_n.jpg
 
Last edited:
.

Pakistan Affairs Latest Posts

Back
Top Bottom