What's new

Indonesia Defence Forum

.
Is it old picture or new Picture? Do our F5 flyable?

This new pic
Some aircraft engine can still be warmed up. But for it still flyable or not, Only TNI AU relevant officers can answered your question truthfully.


Border units guard

EFOi8NjU8AA8gPi.jpeg
EFS4daMUwAAjpd5.jpeg
EFS4cyMU0AAwAQX.jpeg
EFT7ksGU4AE4XYL.jpeg
 
. .
Cara klasik untuk adu domba. Mereka ga tau 98 justru TNI yang paling dijauhi? Nai wa~ (Waiting the release of Kumoko) :devil:

Penasaran seberapa gampang TNI dipancing.


Polisi Sebut Ratusan Mahasiswa Minta Dikawal TNI Aksi di DPR


https://m.cnnindonesia.com/nasional...tusan-mahasiswa-minta-dikawal-tni-aksi-di-dpr

Marinir cuy, yg mereka minta itu marinir. Dari jaman demo 65-98 image Marinir itu paling bagus dimata masyarakat.

Well thats why i am in favor to build Marines Corps so much, including to build them into independen branch outside of Navy, increase the number of their personnel and hardware to counter the ever increasing complex KOSTRAD or TNI AD and at lesser extent including the POLRI (as they owned Brimob). This for the sake of check and balanced. Much like what happened in United States.
 
.
.
Any progress about our indigenous radar and len collaboration with thales? did they offer smart-l mm to us?
 
.
. .
08thai.large.jpg

images (2).jpeg
we should really stop posting more about the riot , its done already , and lets just wait for "pakde" move when the minister reshuffle happened , and people hating the police phenomenon and paradigm not unique to indonesia , its pretty much happened around the globe ,and its another job risk that they need to deal with.

Any progress about our indigenous radar and len collaboration with thales? did they offer smart-l mm to us?

More likely we do cooperation with thales for CMS (combat management system) or the improved version of mandhala , i dont know if there was a domestic semiconductor company that would handle or supporting for our radar research and development (we're lacking on it...)

FB_IMG_1569480076675.jpg
FB_IMG_1569480087312.jpg
FB_IMG_1569480061899.jpg
FB_IMG_1569480058241.jpg
FB_IMG_1569480072055.jpg
FB_IMG_1569480049416.jpg
FB_IMG_1569480045829.jpg


Credit : Lembaga Keris
 

Attachments

  • FB_IMG_1569480049416.jpg
    FB_IMG_1569480049416.jpg
    110 KB · Views: 45
  • FB_IMG_1569480045829.jpg
    FB_IMG_1569480045829.jpg
    53.8 KB · Views: 36
  • FB_IMG_1569480058241.jpg
    FB_IMG_1569480058241.jpg
    101.5 KB · Views: 36
  • FB_IMG_1569480072055.jpg
    FB_IMG_1569480072055.jpg
    83.5 KB · Views: 40
  • FB_IMG_1569480061899.jpg
    FB_IMG_1569480061899.jpg
    70.7 KB · Views: 37
  • FB_IMG_1569480087312.jpg
    FB_IMG_1569480087312.jpg
    105.3 KB · Views: 44
  • FB_IMG_1569480076675.jpg
    FB_IMG_1569480076675.jpg
    108.4 KB · Views: 42
.
View attachment 581209
View attachment 581210 we should really stop posting more about the riot , its done already , and lets just wait for "pakde" move when the minister reshuffle happened , and people hating the police phenomenon and paradigm not unique to indonesia , its pretty much happened around the globe ,and its another job risk that they need to deal with.



More likely we do cooperation with thales for CMS (combat management system) or the improved version of mandhala , i dont know if there was a domestic semiconductor company that would handle or supporting for our radar research and development (we're lacking on it...)

View attachment 581221 View attachment 581220 View attachment 581219 View attachment 581224 View attachment 581218 View attachment 581222 View attachment 581223

Credit : Lembaga Keris
Agree,i hope kabinet baru make the biggest comeback

AFAIK. thales say they collaborate with len for development of our national radar so far they they offered us this i hope they offered smart-L too imagine the radius covered and integrate it with airforce me lorad later and prevent logistic nightmare cuz iver probably will equipped with smart L (i hope its the aesa one)
Thales_signs_strategic_MOU_with_PT_Len_for_Indonesian_radar_development.jpeg

And for manpads i see we collaborate with saab,i see this as a bright future we can make atgm too later and integrate it with our IFV
 
. . .
20190926145947623.jpg
2019092614594272210.jpg
2019092614593610595.jpg

Review of detailed design review committee confirmed 'prototype production possible'-

❍ The Defense Affairs Agency (CEO Wang Jung-hong) held the KF-X Detailed Design Review (CDR) Meeting * from September 24 to 26, allowing all military requirements to be reflected in the design and proceeding to the prototype production stage. It was confirmed that there is.
* CDR (Critical Design Review): Verify that system requirements and functional requirements are all reflected in the initial product specification that satisfies the detailed design, and proceed to prototype production, system integration, and testing within cost, schedule, and risk. Procedure to formally confirm that this is possible



❍ The Korean fighter system development project is under the supervision of the Korea Aerospace Industries (President Ahn Hyun-ho). The development began in January 2016 and completed the basic design in June 2018. Detailed hardware and software details are now available. The design is finalized and part fabrication is in progress.


❍ Up to three years and nine months from the start of the project, the wind tunnel test, the updating of major system models, and the design and analysis results for each field continuously improved the shape.


❍ In this detailed design review meeting, reviewers composed of government and private experts, including the Air Force, reviewed about 390 technical data to confirm that the military requirements were properly reflected in the design.



❍ The head of the Korean Fighter Project Division, Senior Defense Officer, Kwang Sun-sun, said, “Now, Korean fighter aircraft development has successfully passed the detailed design review stage and faces new challenges in the construction and testing of prototypes.” We will make every effort to make Korean fighters with the performances that the military satisfies through cooperation with related organizations. ”


❍ The head of the Korean Air Fighter Project Division, Kwang-Su Ryu, said, “We have made great efforts to develop Korean fighter aircraft that meet the military needs through perfect quality assurance and ground and flight tests of prototypes based on the output from detailed design after the start of system development. I'll make it successful. ”


❍ The Korean fighter system development project will ship the first prototype in the first half of 2021. It will then begin its first flight test in the first half of 2022 and complete development by 2026. In addition, it plans to exhibit a full-scale Korean fighter model at ADEX (Seoul International Aerospace & Defense Exhibition) held in October this year.
http://bemil.chosun.com/nbrd/bbs/view.html?b_bbs_id=10040&pn=1&num=93826#none
 
.
View attachment 581249 View attachment 581250 View attachment 581251
Review of detailed design review committee confirmed 'prototype production possible'-

❍ The Defense Affairs Agency (CEO Wang Jung-hong) held the KF-X Detailed Design Review (CDR) Meeting * from September 24 to 26, allowing all military requirements to be reflected in the design and proceeding to the prototype production stage. It was confirmed that there is.
* CDR (Critical Design Review): Verify that system requirements and functional requirements are all reflected in the initial product specification that satisfies the detailed design, and proceed to prototype production, system integration, and testing within cost, schedule, and risk. Procedure to formally confirm that this is possible



❍ The Korean fighter system development project is under the supervision of the Korea Aerospace Industries (President Ahn Hyun-ho). The development began in January 2016 and completed the basic design in June 2018. Detailed hardware and software details are now available. The design is finalized and part fabrication is in progress.


❍ Up to three years and nine months from the start of the project, the wind tunnel test, the updating of major system models, and the design and analysis results for each field continuously improved the shape.


❍ In this detailed design review meeting, reviewers composed of government and private experts, including the Air Force, reviewed about 390 technical data to confirm that the military requirements were properly reflected in the design.



❍ The head of the Korean Fighter Project Division, Senior Defense Officer, Kwang Sun-sun, said, “Now, Korean fighter aircraft development has successfully passed the detailed design review stage and faces new challenges in the construction and testing of prototypes.” We will make every effort to make Korean fighters with the performances that the military satisfies through cooperation with related organizations. ”


❍ The head of the Korean Air Fighter Project Division, Kwang-Su Ryu, said, “We have made great efforts to develop Korean fighter aircraft that meet the military needs through perfect quality assurance and ground and flight tests of prototypes based on the output from detailed design after the start of system development. I'll make it successful. ”


❍ The Korean fighter system development project will ship the first prototype in the first half of 2021. It will then begin its first flight test in the first half of 2022 and complete development by 2026. In addition, it plans to exhibit a full-scale Korean fighter model at ADEX (Seoul International Aerospace & Defense Exhibition) held in October this year.
http://bemil.chosun.com/nbrd/bbs/view.html?b_bbs_id=10040&pn=1&num=93826#none
I seen some number of korean air force pilot, but no pilot for indonesian delegation?
 
. .

Pakistan Defence Latest Posts

Pakistan Affairs Latest Posts

Back
Top Bottom