What's new

Hassanabdal-Mansehra Expressway (E35)...Updates

. .
Abbottabad


104491573_3012180135529039_663408503882680573_o.jpg
 
.
CPEC 180 km #Hazara Motorway Havelian - Thakot Project was inaugurated last year . It is one of the finest projects of NHA and increased a huge number of Traveler s / Tourists towards Hazara, Gilgit (Kagan, Naran, Hunza Valleys)



104659317_2631172633817921_5183496503285875551_n.jpg






105524701_2631172673817917_8017881669018874839_n.jpg







105192308_2631173313817853_6322199974924952371_n.jpg
 
. . . . . . . . . .
Crap motor way
Extreme slippage in the tunnels even when they are slightly wet. As a result huge no. Of accidents. The motorway police and NHA say they have complained to Chinese firm which constructed the tunnels, but they refuse to take the blame.
At the moment they are death tunnels and should be avoided during rain at all cost.
2. Poor design and planning has resulted in it being 2 lanes from a little further from Shah maqsood, so now in hindsight and idiotic planning all trucks are made to travel in the emergency lane leaving no space for vehicular emergency.
90 % of the protective fence has been stolen and now cattle and people are moving freely across it like on the g.t road.

Worst motorway ever.
 
. .
Back
Top Bottom