What's new

HAL Tejas | Updates, News & Discussions

Status
Not open for further replies.
A squadron consists of 18-20 aircraft not 4 aircraft.

SP-1 to SP-20 will form the 1st squadron.

SP-1 is still being built. No sensors on it nothing its a flying pressurized metal tube.

You seem to be fond of paper plane..:lol:

Squadron contains 16 + 4 reserve

What I said this airforce will begin form a squadron with 4 initial examples

How did you know no sensors in sp2 ?

Got any source ?

A squadron consists of 18-20 aircraft not 4 aircraft.

SP-1 to SP-20 will form the 1st squadron.

SP-1 is still being built. No sensors on it nothing its a flying pressurized metal tube.

You seem to be fond of paper plane..:lol:

Squadron contains 16 + 4 reserve

What I said this airforce will begin form a squadron with 4 initial examples

How did you know no sensors in sp2 ?

Got any source ?
 
.
You seem to be fond of paper plane..:lol:

Squadron contains 16 + 4 reserve

What I said this airforce will begin form a squadron with 4 initial examples

How did you know no sensors in sp2 ?

Got any source ?



You seem to be fond of paper plane..:lol:

Squadron contains 16 + 4 reserve

What I said this airforce will begin form a squadron with 4 initial examples

How did you know no sensors in sp2 ?

Got any source ?

Wrong.

In IAF squadrons are 16 combat active+2 training+3 reserve/repair/maintainece/overhaul.

Are you false flagger?

:mod::mod::mod::mod:
 
. . .
LCA2-600-x-331.jpg


Every major power – and there are just a handful of them – have the capability to aspire to design, develop and manufacture fighter aircraft by themselves. Now, ideally, this would include all critical technologies – aero-engines, aircraft design, metallurgy, radar, sensors and weapons. However, very few countries have mastery and control in all these areas; the early birds or leaders – USA, Russia, UK and France are closely followed by Germany, Japan, Italy and Sweden.

Aspirants after the Second World War included Argentina, Brazil, China, Egypt, India, Indonesia, Israel, Iran, South Korea and Taiwan, of which only a few have emerged as successful late entrants into the aerospace club.

These are Brazil, China, India, Israel and South Korea. While China and Israel lead the pack, all of them have built capabilities and strengths in a few domains but no one has comprehensive mastery of all the relevant technologies.

The most complex challenge involves design and development of aero-engines and aviation grade materials. Except for China to some extent, none of the others have achieved any meaningful control of technology in these two domains. The mastery of aerospace technology will continue to remain a huge challenge for emerging powers like India.

Good beginning but poor follow-up

India’s aspiration to build its own fighter aircraft began well with the HF-24 programme. India took the prescient decision to bring in Dr Kurt Tank to head the design team in the fifties, when denial regimes were yet to take shape.

In the aftermath of the Second World War, Dr Kurt Tank had offered his services to Argentina which gladly accepted. By 1948, he had designed the fighter Pulqui II, a state-of-the-art fighter in its time. A prototype was built but its development was cut short by Argentina’s political turmoil.

That is when he moved to India and taught at IIT, Madras before he was entrusted in 1957 with the task of designing the HF-24 for Hindustan Aeronautics Limited (HAL). Until then, the only aircraft designed and built by HAL was the basic trainer HT-2. Attempting to develop the HF-24 after the HT-2 was an audacious leap in aspiration.

Dr Kurt Tank was allowed to bring his small team of German engineers who formed the nucleus of the final design strength of 150 HAL engineers by the end of the development. The project was sanctioned in 1957 and the first prototype flew in 1961, a mere four years later and the first squadron of series production aircraft went operational in 1967, only six years later!

Though handicapped by underpowered engines, the HF-24 acquitted itself well in the strike role in the 1971 Indo-Pak war.

The HF-24 was, in its time, a brilliant design and a state-of-the-art aircraft. The programme met an untimely demise in 1982 due to the short-sightedness of the User, Government and the Industry.

The User’s leadership displayed singular lack of foresight and national perspective when it decided to phase out the aircraft in 1982, a mere 15 years later. The political leadership and the bureaucracy displayed ignorance and strategic blindness during the course of the HF-24’s development and operational life. Decisions on engine development with foreign collaboration were shelved under the pretext of being too expensive, when the cost involved was a mere Rs 5 crores.

The industry failed to follow a strategy of developing improved derivatives in order to sustain the huge leap achieved with the help of Dr Kurt Tank’s team.

The net result was withering away of precious talent. The entire 1970s was a lost decade.

HAL shifted its focus to license production of MiG-21s and when the Light Combat Aircraft (LCA) decision was taken in 1985, HAL’s design capability was at an all time low. It lost the control of the design process and management to the Defence Research and Development Organisation (DRDO), which created the Aeronautical Development Agency (ADA) to manage the LCA programme.

LCA – Genesis and Flawed Decisions

Of late there have been frequent articles written by a few self-proclaimed champions of indigenisation and Tejas patriots. Although they presume a license to comment on how the Indian Air Force (IAF) must learn to fly and fight any war with the Tejas as its backbone and not pursue the MMRCA or FGFA, their views are spectacularly misinformed and reflect their ignorance of aeronautics, air combat and strategy and military aviation. They would do well to study the LCA programme’s genesis, development, hurdles, indigenous content and its true performance in order to appreciate its possible role and potential. The following narrative is for their benefit as well.

The Light Combat Aircraft concept was earlier referred to as the Light Weight Fighter (LWF). This concept has been a source of much study and research throughout aviation history to try and achieve performance requirements at affordable cost. This became more feasible in the jet age as downsizing of engines was relatively easier.

The Folland Gnat, which the IAF flew successfully in its 1965 and 1971 wars, was a classic Light Weight Fighter whose performance, in its age, was excellent at minimal cost, although it also brought with it large compromises in safety and reliability.

The MiG 21 has effectively proved to be the most successful Light Weight Fighter since its introduction. The IAF will have operated the MiG-21 for almost six decades if it phases out the last of them by 2020. The focus of the concept of the light weight fighter has always been low cost balanced by acceptable performance.

The genesis of modern Light Weight Fighter development goes back to the late sixties and early seventies, which ultimately resulted in the production of the most efficient Light Weight Fighter of the century, the F-16. The “Fighter Mafia” led by the late John Boyd and his Energy-Manoeuvrability theory laid the foundation for future light weight fighter development.

This radical change in concept became necessary because of the poor performance of technologically advanced, heavily armed, expensive and large aircraft like the F-4 Phantom against the low cost, technologically inferior but much smaller, highly nimble and agile aircraft like the MiG-15 and the MiG-21. A process of competitive prototype development was adopted. At the core of the LWF’s design requirement was performance.

The YF-16, which won the prototype competition in 1972, was the first aircraft design to be based on unstable platform and fly-by-wire control system. It was also the first to use composite material for structures. The rest is history.

The prototype programme began in 1971 and the series production F-16 was in operational service by 1978. Fundamentally, the F-16 programme validated the relevance of balancing technology while keeping performance and low cost as the drivers of the programme.

By the late 1970s the IAF was looking for a replacement for its accident- prone and unreliable Gnat and its Indian version, the Ajeet. The requirement was a low-cost, conventional aircraft to replace the Gnat/Ajeet and the early MiG-21 fleet (Fishbed) by the late 1980s.

Based on its experience of the Gnat and the need for a low-cost fighter, the IAF projected the requirement for a small fighter of 5 tonnes empty weight. This would have left the aircraft only marginally larger than the Gnat and even smaller than the MiG-21.

This was a flawed approach and indicated that the Light Weight Fighter concept had not been studied in depth and could have been due to inadequate information at that time.

But that is only partially correct, as HAL did the feasibility study with consultancies from all leading aircraft design houses of Europe.

After the initial feasibility studies the IAF and HAL concurred on the plan for a conventional fixed wing fighter to be developed. The DRDO then stepped in to suggest that the fighter development programme be used to bridge technology gaps – Fly-By-Wire (FBW) control system, airborne radar, aero-engine and composite structures.

By the early 1980s this was agreed to and an ambitious plan to develop a fourth generation platform with high performance was put up to convince the government. The approval was followed up by the formulation of the Air Staff Requirements (ASR) in tune with the performance expected of a fourth generation fighter.

This is where the anomalies in decision-making crept in.

To develop a fourth generation fighter within a 5-ton lightweight airframe was a tall order. And although it was revised upwards to a 6-ton empty weight requirement, even this was difficult to achieve.

The projected time frame of less than a decade for the completion of development and operational induction of the aircraft was not only over-optimistic but also almost foolhardy, given the status of the technical base that existed with respect to FBW, aero-engine and the airborne radar.

Starting from scratch, each of these would have required nothing less than two decades of focused research and foreign assistance.

Ultimately, two of the major technology objectives were not achieved: the Kaveri aero-engine programme floundered even after three decades of work and has now been declared foreclosed, while the airborne radar did not make any headway and was dropped in 2006 in favour of the Israeli Elta-2032 radar.
 
. .
LCA Navy all set for ski-jump trials at SBTF Goa
SOURCE: ONE INDIA

np1+1.jpg


Scripting a new chapter in India’s naval aviation history, the Light Combat Aircraft (LCA) Naval Prototype-1 (NP-1) is all set to undertake critical trials at INS Hansa in Goa for the first time. Sources confirm to OneIndia that the NP-1 undertook ‘extensive pre-requisite flying’ at HAL Airport in Bengaluru ahead of its expected ferry to Goa soon. “The aircraft is in a good shape now. In the last two weeks alone, we did five flights. Specified speed, Mach No, altitude, Angle of Attack, undercarriage operations and ground accelerations all have been tested and found satisfactory,” an official said.

The NP-1 (trainer variant) was rolled out with great fanfare on July 6, 2010 and the aircraft had its maiden flight on April 27, 2012. As on December 6, 2014, the platform could only achieve 29 flights.

NP-1 to perform a challenging task at SBTF

An advance team of experts has already landed at Goa ahead of the NP-1 campaign at INS Hansa. “Modifications on the NP-1 have already done for the ski-jump activities. Ski-jump is a technologically challenging task achieved by India. Only very few countries (US and Ukraine among known nations) can boast of a facility like SBTF,” the official said.

The SBTF is currently regularly used by the MiG 29Ks, before their operations onboard INS Vikramaditya. “The MiG 29Ks have been undertaking ski-jump and arrester hook landing for some time now. The LCA Navy will be doing only ski-jumps now. We will have two-week preparation time ahead of the first mission,” the official added. The NP-1 will be ferried (

The NP-1 will be ferried (flown from point to point) from HAL Airport and it would cover the distance to Goa within an hour. It will be first a home-grown naval aviation platform will to land at INS Hansa. Commodore T A Maolankar from the National Flight Test Centre is expected to pilot NP-1 during Goa mission.

The Navy is expected to give an official name for the LCA Navy soon as they were not keen to go with Tejas. It was former Prime Minister A B Vajpayee who named the IAF variant as Tejas. The ADA-HAL-Navy teams plans to invite PM Narendra Modi for the naming ceremony in future. The trials at the SBTF are crucial as it would give the team confidence to undertake further trials on NP-1. A second prototype (NP-2, fighter variant) is also getting ready at the HAL hangars, which is expected to have its maiden flight before the end of this year.

Largest R&D programme in India The LCA programme has become the largest R&D programme India has undertaken in the military aerospace arena. Each LCA costs around Rs 250 crore, while the GSLV is pegged at Rs 220 crore, PSLV Rs 80-100 crore and Agni Rs 50 crore.

The LCA programme has become the largest R&D programme India has undertaken in the military aerospace arena. Each LCA costs around Rs 250 crore, while the GSLV is pegged at Rs 220 crore, PSLV Rs 80-100 crore and Agni Rs 50 crore.”Though the aircraft is dogged with some problems right now, few local sorties have set the stage for the ferry. Joining NP-1 will be PV6 trainer and probably LSP7 from the Tejas flightline. The latter two may further proceed to Leh. In parallel, the HJT-36 (Intermediate Jet Trainer) is also scheduling sea level trials and asymmetric stores jettison exercises at Goa,” an official said.

SBTF is a tech marvel

The SBTF replicates a static model of the Indigenous Aircraft Carrier (IAC) being built at the Cochin Shipyard. The SBTF has 14 deg parabolic profile ski-jump for take-off and an arresting gear for landing. The main objective of SBTF is for the certification of naval LCA for ship-borne operations, which is a mandatory requirement ahead of the aircraft’s operations onboard IAC for the carrier compatibility test (CCT).

The SBTF is equipped with restraining gear system with ski-jump for take-off and an arresting gear system for landing. It also uses an optical landing system, TV landing control system, light signaling system and a series of auxiliary units, akin to the IAC.

The story so far dogged in delays

Similar to its elder sibling Tejas, the Indian Air Force (IAF) variant of LCA, the NP-1 too got embroiled in serious developmental issues, delaying the project. In the past, its designers at the Aeronautical Development Agency (ADA) and makers at the Hindustan Aeronautics Ltd (HAL) had to deal with nagging issues linked to the arrestor hook, landing gear and LEVCONs (control surfaces which allow for better low-speed handling).

In an interview to OneIndia recently, Navy Chief Admiral R K Dhowan had expressed concern over the delay in LCA naval programme. “It’s an important programme for us and we have the IAC (Indigenous Aircraft Carrier) in Kochi getting ready and the SBTF waiting for LCA Navy. It’s important that the programme is speeded up,” the navy chief had said. Naval sources say

so SP 2 & NP 2 are due before the end of this year...
 
. .
@amardeep mishra

if you have understanding about TEJAS radar and ELECTRONIC ATTACK tejas variant,

can you please elaborate for us in simple terms

ps: pubic domain info will suffice!
 
Last edited:
.
NLCA LSTT & EGR on restraining gear system 200 mtr from ramp done successfully.

Ski-jump on Dec 15?
 
. .
LCA can be a LIFT (lead in fighter trainer) aircraft not advanced trainer

even for LIFT. tejas needs certification.

acrobatics team need a slow aircraft, with good turnaround times, less maintenance and less $ per hour flying

its like using BENZ or BMW, where Maruti 800 will suffice

----------------------------------------

Tejas has airforce variant, naval variant and twin seat trainer variant..

it will be on par with Mirage aircraft overall...

mk2 will be better than mirages..

To call it trainer, they must have motives..
 
.
IAF have said LCA is good enough for advanced trainer .
Then why the hell are we buying last batch of Hawks for Surya kiran aerobatic team?
Hawks Fly Away With India’s Jet Trainer v2 Competition
@sancho @Water Car Engineer @SpArK @sathya


Hawk is OK but do not confused between Surya kiran and tejas. They are in different league. Training have various phases. SK is used in priliminary training while HAWK is used in last hpase of training. Tejas can replace that.
 
.
Hawk is OK but do not confused between Surya kiran and tejas. They are in different league. Training have various phases. SK is used in priliminary training while HAWK is used in last hpase of training. Tejas can replace that.

can tejas replace hawk?:o:

i dont think it can.. it will be a waste of resources. and doesn t fit too..

tejas is a level higher, it can only be used for LIFT (even for for that, has to be customized and certified)
 
.
can tejas replace hawk?:o:

i dont think it can.. it will be a waste of resources. and doesn t fit too..

tejas is a level higher, it can only be used for LIFT (even for for that, has to be customized and certified)


Yes it is a best replacement and indigeneous one.

Hawk is not very cheap.

Yes tejas is a level higher.
 
.
Status
Not open for further replies.

Pakistan Defence Latest Posts

Country Latest Posts

Back
Top Bottom