Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Sorry.
Kiss Tejas goodbye in 25 years.
Indigenous content of the LCA Tejas Aircraft is 59.7% by value and 75.5% by numbers
Still not good enough for folks here.
Anyways, they wont have time to read this today. Party going on with new Pakistani Navy thriller movie.
is the navy's tejas the carrier based variant?
It is called the N-LCA (Navy uses the project names unlike the IAF) and yes, this is the Technology Demonstrator for the operational carrier borne fighter.is the navy's tejas the carrier based variant?
Cost of flying a Tejas on a mission per hour along with life cycle costs.
Has it been on an actual carrier? cause the pic posted looks like ground testing.It is called the N-LCA (Navy uses the project names unlike the IAF) and yes, this is the Technology Demonstrator for the operational carrier borne fighter.
Indigenous content of the LCA Tejas Aircraft is 59.7% by value and 75.5% by numbers
Still not good enough for folks here.
Anyways, they wont have time to read this today. Party going on with new Pakistani Navy thriller movie.
Has it been on an actual carrier? cause the pic posted looks like ground testing.
Not yet, the rumour is that N-LCA will be tested from on board the INS Vikramaditya "soon".Has it been on an actual carrier? cause the pic posted looks like ground testing.
trollFor that it needs to be good enough for IAF first.
Regards
http://english.mathrubhumi.com/news...r-tapas-drdo-indian-air-force-tejas-1.1519345DRDO DG (Aero) C P Ramanarayanan said LCA with Kaveri engine might fly in 2018. He said DRDO is already in consultation with Snecma. Already Rs 2,105 crore has been spent on the project. Another Rs 600 crore is likely to be needed for the testing phase.