MastanKhan
PDF VETERAN
- Joined
- Dec 26, 2005
- Messages
- 21,269
- Reaction score
- 166
- Country
- Location
Hi,Thank you . Someone understood my gibberish and started a sensible discussion. I think overtime with India acquiring more 4th gen++ platforms as well as one or two 5th gens, Pakistan (is being) and will be put in a position to offset those by acquiring more J-10C's. The beauty of the J-10C platform is that it literally fulfills essentially all PAF requirements, i.e. advance tech and sensors, single engine, speed, agility, loadout, etc. Which is where I think we should stop the JFT at block III and complete that order and move onto standardizing the J-10C and it's future variants via local assembly.
India cancelled and dabbled with Rafale for like a decade ONLY to force the French to allow them to license build it locally to standardize it and make AMCA their stealth platform. The French didn't budge. J-10 is our Rafale so we need to standardize it.
The Chinese would love to sell us the manufacturing line if we pay for it. It's a win-win for them. They've already made use of the current production line by producing over 500 J-10's. They are now phasing out future development of the J-10 platform, selling it's manufacturing line to a third tier aircraft manufacturer to essentially use it for maintenance / upgrades / rebuild, etc. J-10 now has a limited role in the Chinese military.
So it's very feasible for us to acquire the assembly line for less or more of the same amount we'd be building a "rebuild" factory 10 years from now. If we don't standardize the J-10 platform thinking long term now, we'd be forced to procure it like the Mirages!
We are an official partner in the TFX now, plus KizilElma and Akinci are coming too. We just need a J-10C like advanced workhorse beyond the JFT and we are covered for the next 30 years.
Seems like you lack industrial experience---.