singlefighter
FULL MEMBER
- Joined
- May 11, 2016
- Messages
- 363
- Reaction score
- -2
- Country
- Location
We have 500 kv national transmission line which is the 10 highest rate transmission line in the world so can handle this power generation and can distribute it all over the country insha Allah we will be fully powered with electricity in start of 2018 and when then bhasha dam ,karachi nuckear power plants ,and bonji dam will be completed near about 2022 the generation of extra electricity available around 13000 mega watts insha Allah hope for the best