What's new

End to load-shedding? Power production to cross 33,000MW in 2018

load sheddiing will definitely be reduced temporarily in 2018. the govt will pay to the companies and they will start functioning at full strength and then the ganjas will claim look we have ended load shedding.

Ok what about many power project that are under Construction Included in CPEC and apart of it?
 
Too many negative people on this forum. Can't take anything positive and appreciate it. I wonder how your daily lives are, just filled with anger, negativity and drama!!
Say a members who is with us since 2011 and have over 6000 posts :lol:
 
5e53c9841b355fa1824ce07ca0fc3771.jpg
 
Seems to be preparation in advance for 2018 election however, we did not forget all those claims made before last election as well in the same contexts that amended quickly yet thinking to fool the people once again. What about "Zardari ko ghaseetna".
 

Couldn't expect much than this. Every sane minded knew it since start that they are playing it well to dodge Pakistanis, both the PPPP and PMLn. Soon we will be seeing, Zardari as president being favoured by PMLn to save the face and to get help. Almost two times speech on TV and sudden Jalsas in Pakistan by NS himself after P. Leaks yet no words on such platforms against Yadave & co and recent US attack in Balochistan.
 
it's not the supply issue but the 'Kunda Mafia' and 'non Payment' leading to Power Outages ... specially in karachi
 
Couldn't expect much than this. Every sane minded knew it since start that they are playing it well to dodge Pakistanis, both the PPPP and PMLn. Soon we will be seeing, Zardari as president being favoured by PMLn to save the face and to get help. Almost two times speech on TV and sudden Jalsas in Pakistan by NS himself after P. Leaks yet no words on such platforms against Yadave & co and recent US attack in Balochistan.
Agreed both of these partys are ek hii thaali ke bengan you know even now they're just playing games wid ik and Pakistani awam on panama issue
 
27th May 2016,

ISLAMABAD: Water and Power Secretary Younus Dagha has said that electricity outages will come to an end in 2018 as production capacity will rise above 33,000 megawatts, easily eclipsing estimated demand for 25,961MW that year.

In the total production, hydroelectric power will have a 28% share, followed by furnace oil-based electricity at 17% and liquefied natural gas-based power at 15%. Local natural gas-powered electricity will contribute 12%, imported coal 10%, renewable energy sources and nuclear power 8% each and local coal 2%.

Load-shedding: Power sector governance – a lost hope

Recalling the difficult situation about three years ago, the water and power secretary told media on Thursday that in 2013-14 there was unpredictable load-shedding, higher unemployment of industrial labour, fuel shortage at power plants, rampant overbilling, years of delay in issuing letters of support and a weak transmission network that was not capable of carrying more than 15,500MW.

Rs329b.jpg


In that year, industrial and domestic consumers were facing power blackouts for 12 to 15 hours a day, which was reduced to six hours for urban and eight hours for rural regions in 2015 and the summer of 2016 with no outages for industrial units.

Dagha declared that load-shedding hours would come down to four in urban centres and stand at eight hours for rural areas in December 2016, which would be further cut to two and three hours for urban and rural areas respectively in June 2017. Later, outages would come to an end in January 2018, he said.

Regarding the expected gradual increase in power production, Dagha claimed that production capacity would be 19,917MW against demand for 23,107MW between June and November 2016. From December 2016 to April 2017, the capacity will rise to 21,599MW and further go up to 25,080MW in June 2017. In December 2017, the capacity will stand at 27,600MW and in June 2018, it will be 30,938MW whereas demand will be 25,961MW and availability at 26,590MW.

He stressed that electricity transmission and distribution losses had come down to the lowest in the past 10 years at 18% in 2015. Its positive financial impact has been estimated at Rs10 billion.

On the other hand, bill recoveries, which were 92.3% in 2007, rose to 93.4% in 2015 with a beneficial financial impact of Rs51 billion.

Apart from these, the secretary said, the circular debt, which stood at Rs320 billion in October 2014, had been restricted to Rs329 billion.
http://tribune.com.pk/story/1111187/end-load-shedding-power-production-cross-33000mw-2018/
:what: @Zibago @django @Moonlight @Max Pain @PaklovesTurkiye
I suspect this is all a pack of lies, they have been saying these types of thing for years, come jan 2018 we will probaably be in the same boat.
 
anyone can post photos of so many failed projects . i am wasting my time here. bye
 

Pakistan Affairs Latest Posts

Back
Top Bottom