he-man
ELITE MEMBER
- Joined
- Aug 29, 2013
- Messages
- 11,018
- Reaction score
- -28
- Country
- Location
Don't be blind man,they neither have manpower nor money for most of these projects.I wont fight here but please go and see the average development cost of a turbofan and average r&d that goes into making a 5 th generation plane..........quote the numbers and then discuss with me how they are gonna bring that money and we have a discussionThey can in fact spare money and manpower for 100 different projects all at the same time.
We couldn't risk being outstripped by every other nation engrossed in making turbofans. Going for a VCE was imho a wise choice, imagine if we succeeded in a conventional turbofan at the same pace as the current Kaveri and then if DRDO says they want to do a VCE engine with similar power, imagine the hurdles then.
I urge u to check what a vce is and how many countries have made a vce.......that would give u an answer that this was a stupid choice.
Tejas' delay for example can be atributed to the MoD of 2010 when they idiotically and prematurely concluded the LCA contracts before ADA could even freeze the final design.
Who does that....
I emphatically agree with this.
DRDO/HAL have got good success on tejas and its the air force that is acting as a stumbling block.
They have again changed the requirements of mk1a,for the love of god have some shame.