CV-18 Fujian - Type 003 Aircraft Carrier News & Discussions

We ought to do it for SDF also. Don't know why we haven't ...
I have a question about Sino Defence Forum if you do not mind. My account never received the confirmation e-mail and is stuck for the last part of the registration process despite repeated attempts. Do you know how I can fix that?
 
. . . .
Now it's clearer that PLAN will employ NEW carrier-borne fighter in the next aircraft carrier.

His name is Zhao Dengping 赵登平
I seriously doubt it. I'm pretty sure the poster is referring to a new variant of the J-15. A naval conversion of the J-20 or FC-31 would take years; way after 003 is done. The much more important portion is the "carrier-borne fixed wing AEW". That would mean that this carrier is certainly CATOBAR, probably EMALs.
 
.
I thought they are Chinese underwater greatwall or Chinese Unmanned Subs.
May this article be the answer to what you asked?

China's quantum submarine detector could seal South China Sea | New Scientist (8/22)

On 21 June, the Chinese Academy of Sciences hailed a breakthrough – a major upgrade to a kind of quantum device that measures magnetic fields. The announcement vanished after a journalist pointed out the invention’s potential military implications: it could help China lock down the South China Sea.

SQUIDs are only one of the ways that China has been upgrading its anti-submarine capability over the last few years. The “Underwater Great Wall”, a string of submerged sensors, buoys and drone submarines, is thought to be close to completion. The project will help China extend its offshore surveillance zone.

I just posted the New Scientist's article here.
https://defence.pk/pdf/threads/chinas-submarine-fleet-evolution-news.302638/page-35#post-9797977
 
.
招标项目名称 特种船舶研制保障条件建设项目重型总组平台 :D:D

建设地点 上海市崇明县长兴岛长兴江南大道988号。位于港池北护岸后方陆域,西邻跃进河新建泵闸及跃进河,东部位待建4#总装场地,北侧为厂区2号道路。

工程规模描述
建设规模 本项目占地面积19956㎡,包含:1)新建重型总组平台;2)新建过渡道路;3)新建吊车轨道;4)新建纵向地沟;5)新建移动风雨棚基础。
其中:
1)重型总组平台:宽50m,长350m,占地面积17500㎡
2)过渡道路:宽16m,长153.5m,占地面积2456㎡;
3)2组450T龙门吊轨道,1组32T门座式起重机轨道;另外场地内300T龙门吊一组,其轨道与450T与32T中各一根轨道共轨;
4)平台两侧均通长布置的纵向地沟,共2条,共计约683.74m长。每条地沟一般均分为动力地沟,水、动力合用地沟以及电气地沟三支;
5)移动风雨棚基础:轨距46.5m,单根轨道长度350m,轨道总长度700m。
项目类别 构筑物工程项目
工程总投资(万元) 485604万元人民 币
标段建安造价
(万元) 14278.3万元人民 币
本标段最高投标限价(万元) 14277.3万元人民 币
施工工期(日历天) 180日历天

:lol::lol:

特种船舶研制保障条件建设项目钢材预处理工场、油漆库、危废库及固废堆场施工招标公告
上海 2017-09-02
T | T
招标编号: 招标编码:CBL_20170902_38860609
开标时间: 标讯类别: 国内招标
招标人:江南造船(集团)有限责任公司
资金来源: 其它
报建编号 1501CM0036 标段号 C16
招标人 江南造船(集团)有限责任公司
招标项目名称 特种船舶研制保障条件建设项目钢材预处理工场、油漆库、危废库及固废堆场
建设地点 上海市崇明县长兴岛长兴江南大道988号
工程规模描述
建设规模 本项目新增建筑面积2467㎡,包含:1)新建钢材预处理工场;2)新建油漆库;3)新建危废库房;4)新建危废库棚;5)新建固废堆场。
其中:
1)钢材预处理工场:地上1层,项目占地面积1384㎡,建筑面积1236㎡,预处理工场为1层钢结构,铺房为2层钢筋混凝土框架结构,建筑高度13.95m,最大跨度15m;
2)油漆库:地上1层,项目占地面积737㎡,建筑面积737㎡,钢筋混凝土框架主体结构,钢结构屋面,建筑高度7.45m,最大跨度12m;
3)危废库房:地上1层,项目占地面积439㎡,建筑面积248㎡,钢筋混凝土框架结构主体结构,钢结构屋面,建筑高度6.15m,最大跨度10m;
4)危废库棚:地上1层,项目占地面积493㎡,建筑面积246㎡,钢结构,建筑高度7.15m,最大跨度20m;
5)固废堆场:项目占地面积610㎡。
项目类别 工业建筑
工程总投资(万元) 485604万元人民 币
标段建安造价
(万元) 1701.7万元人民 币
本标段最高投标限价(万元) 1613.6875万元人民 币
施工工期(日历天) 120日历天
 
.
招标项目名称 特种船舶研制保障条件建设项目重型总组平台 :D:D

建设地点 上海市崇明县长兴岛长兴江南大道988号。位于港池北护岸后方陆域,西邻跃进河新建泵闸及跃进河,东部位待建4#总装场地,北侧为厂区2号道路。

工程规模描述
建设规模 本项目占地面积19956㎡,包含:1)新建重型总组平台;2)新建过渡道路;3)新建吊车轨道;4)新建纵向地沟;5)新建移动风雨棚基础。
其中:
1)重型总组平台:宽50m,长350m,占地面积17500㎡
2)过渡道路:宽16m,长153.5m,占地面积2456㎡;
3)2组450T龙门吊轨道,1组32T门座式起重机轨道;另外场地内300T龙门吊一组,其轨道与450T与32T中各一根轨道共轨;
4)平台两侧均通长布置的纵向地沟,共2条,共计约683.74m长。每条地沟一般均分为动力地沟,水、动力合用地沟以及电气地沟三支;
5)移动风雨棚基础:轨距46.5m,单根轨道长度350m,轨道总长度700m。
项目类别 构筑物工程项目
工程总投资(万元) 485604万元人民 币
标段建安造价
(万元) 14278.3万元人民 币
本标段最高投标限价(万元) 14277.3万元人民 币
施工工期(日历天) 180日历天

:lol::lol:

特种船舶研制保障条件建设项目钢材预处理工场、油漆库、危废库及固废堆场施工招标公告
上海 2017-09-02
T | T
招标编号: 招标编码:CBL_20170902_38860609
开标时间: 标讯类别: 国内招标
招标人:江南造船(集团)有限责任公司
资金来源: 其它
报建编号 1501CM0036 标段号 C16
招标人 江南造船(集团)有限责任公司
招标项目名称 特种船舶研制保障条件建设项目钢材预处理工场、油漆库、危废库及固废堆场
建设地点 上海市崇明县长兴岛长兴江南大道988号
工程规模描述
建设规模 本项目新增建筑面积2467㎡,包含:1)新建钢材预处理工场;2)新建油漆库;3)新建危废库房;4)新建危废库棚;5)新建固废堆场。
其中:
1)钢材预处理工场:地上1层,项目占地面积1384㎡,建筑面积1236㎡,预处理工场为1层钢结构,铺房为2层钢筋混凝土框架结构,建筑高度13.95m,最大跨度15m;
2)油漆库:地上1层,项目占地面积737㎡,建筑面积737㎡,钢筋混凝土框架主体结构,钢结构屋面,建筑高度7.45m,最大跨度12m;
3)危废库房:地上1层,项目占地面积439㎡,建筑面积248㎡,钢筋混凝土框架结构主体结构,钢结构屋面,建筑高度6.15m,最大跨度10m;
4)危废库棚:地上1层,项目占地面积493㎡,建筑面积246㎡,钢结构,建筑高度7.15m,最大跨度20m;
5)固废堆场:项目占地面积610㎡。
项目类别 工业建筑
工程总投资(万元) 485604万元人民 币
标段建安造价
(万元) 1701.7万元人民 币
本标段最高投标限价(万元) 1613.6875万元人民 币
施工工期(日历天) 120日历天
Could you please translate this into English ... thanks
 
.
招标项目名称 特种船舶研制保障条件建设项目重型总组平台 :D:D

建设地点 上海市崇明县长兴岛长兴江南大道988号。位于港池北护岸后方陆域,西邻跃进河新建泵闸及跃进河,东部位待建4#总装场地,北侧为厂区2号道路。

工程规模描述
建设规模 本项目占地面积19956㎡,包含:1)新建重型总组平台;2)新建过渡道路;3)新建吊车轨道;4)新建纵向地沟;5)新建移动风雨棚基础。
其中:
1)重型总组平台:宽50m,长350m,占地面积17500㎡
2)过渡道路:宽16m,长153.5m,占地面积2456㎡;
3)2组450T龙门吊轨道,1组32T门座式起重机轨道;另外场地内300T龙门吊一组,其轨道与450T与32T中各一根轨道共轨;
4)平台两侧均通长布置的纵向地沟,共2条,共计约683.74m长。每条地沟一般均分为动力地沟,水、动力合用地沟以及电气地沟三支;
5)移动风雨棚基础:轨距46.5m,单根轨道长度350m,轨道总长度700m。
项目类别 构筑物工程项目
工程总投资(万元) 485604万元人民 币
标段建安造价
(万元) 14278.3万元人民 币
本标段最高投标限价(万元) 14277.3万元人民 币
施工工期(日历天) 180日历天

:lol::lol:

特种船舶研制保障条件建设项目钢材预处理工场、油漆库、危废库及固废堆场施工招标公告
上海 2017-09-02
T | T
招标编号: 招标编码:CBL_20170902_38860609
开标时间: 标讯类别: 国内招标
招标人:江南造船(集团)有限责任公司
资金来源: 其它
报建编号 1501CM0036 标段号 C16
招标人 江南造船(集团)有限责任公司
招标项目名称 特种船舶研制保障条件建设项目钢材预处理工场、油漆库、危废库及固废堆场
建设地点 上海市崇明县长兴岛长兴江南大道988号
工程规模描述
建设规模 本项目新增建筑面积2467㎡,包含:1)新建钢材预处理工场;2)新建油漆库;3)新建危废库房;4)新建危废库棚;5)新建固废堆场。
其中:
1)钢材预处理工场:地上1层,项目占地面积1384㎡,建筑面积1236㎡,预处理工场为1层钢结构,铺房为2层钢筋混凝土框架结构,建筑高度13.95m,最大跨度15m;
2)油漆库:地上1层,项目占地面积737㎡,建筑面积737㎡,钢筋混凝土框架主体结构,钢结构屋面,建筑高度7.45m,最大跨度12m;
3)危废库房:地上1层,项目占地面积439㎡,建筑面积248㎡,钢筋混凝土框架结构主体结构,钢结构屋面,建筑高度6.15m,最大跨度10m;
4)危废库棚:地上1层,项目占地面积493㎡,建筑面积246㎡,钢结构,建筑高度7.15m,最大跨度20m;
5)固废堆场:项目占地面积610㎡。
项目类别 工业建筑
工程总投资(万元) 485604万元人民 币
标段建安造价
(万元) 1701.7万元人民 币
本标段最高投标限价(万元) 1613.6875万元人民 币
施工工期(日历天) 120日历天
It says about the issuance of a new bidding project: to construct a special ship development support facility, a heavy construction project in the Changxing Island, Shanghai, that is JNCX Shipyard... the construction area is as large as nearly 20,000 sq. meters which includes: 1) the new heavy assembly platform; 2) the new transitional road; 3) new crane rail; 4) the new vertical trench; 5) new mobile shelter base

Total investment of project (the whole new project incl. this part): around 4,856 millions RMB;
construction cost of bid section: around 143 millions RMB; project duration: 6 months

The 2nd project at that site/for the same company at below says:

The construction scale of the project new construction area of 2,467 square meters, including: 1) new steel pretreatment workshop; 2) new paint base; 3) new hazardous waste warehouse; 4) new hazardous waste storage shed; 5) new waste yard.
construction cost of bid section: around 17 millions RMB
project duration: 4 months

Noticing the figures? :lol: These two projects are valued at more or less 143 & 17 mio respectively while the shipbuilder company has allocated fund as much as 4,856 millions RMB to build various new facilities there... means there are many more to construct at that site, the Changxing Island!!

Key message: the JNCX Shipyard is flourishing, has deep pocket, keep on building new facilities, thus one may expect that with more and better facilities, more new ships will come out at faster rate (as well as better quality) :enjoy: :china:
 
Last edited:
. . . . .
I thought they already said conventional with EMALS :enjoy:

Not 100% sure, everything can be possible right now.

The CSSC did hint that they have finished a new type of nuclear reactor on the land, and it is super classified, so most likely being tested for the nuclear supercarrier.

The test of the nuclear reactor for the submarine should belong as the job to the CSIC.
 
.
Not 100% sure, everything can be possible right now.

The CSSC did hint that they have finished a new type of nuclear reactor on the land, and it is super classified, so most likely being tested for the nuclear supercarrier.

The test of the nuclear reactor for the submarine should belong as the job to the CSIC.