TaimiKhan
SENIOR MODERATOR
- Joined
- Jan 3, 2009
- Messages
- 8,956
- Reaction score
- 10
- Country
- Location
PTI after showing no results in 3 years has only left with one option....create problems.
Bhai, Peshawar aajaoo zara. Logon sae pooch loo phir aisi statements diya karooo.
And they are not creating problems, they are talking based on facts on the ground. Whats the use of industrial estates when the route is not gonna pass through or near them.
Industrial estate at Ghazi as per first post while there is another failed industrial estate near by known as Gadoon Amazai where majority of the units are already closed and the road is trash at major of places. And as for Hydro projects i don't understand why adding them in CPEC when these projects were already on the card and why will they benefit KPK when we are not getting full royalty of the already installed projects in KPK. And there are many other loopholes which can be pointed out.
Last edited: