What's new

Comparative Cost of Metro

.
Interesting... corruption main to hum India ko bhi peechay chor gaye hain... isi liye I have been advocating ke agar itna kharcha karna hai to thora sa aur kharcha kar ke metro train bana letay... warna aam roads pe 2 lanes add kar ke chotay chotay divider laga detay taa ke dosri cars is lane pe na aa jayen aur aise hi bus chala detay... halka phulka kharcha hota aur same service mil jaati
 
.
Interesting... corruption main to hum India ko bhi peechay chor gaye hain... isi liye I have been advocating ke agar itna kharcha karna hai to thora sa aur kharcha kar ke metro train bana letay... warna aam roads pe 2 lanes add kar ke chotay chotay divider laga detay taa ke dosri cars is lane pe na aa jayen aur aise hi bus chala detay... halka phulka kharcha hota aur same service mil jaati
Sir kia kah rahay ho ...yea Bus into arbon rupay mein bana daity hein pata nahi train kitnay karbo mein banayengay ...?
 
.
Those billboards, "Hum Nawaz Sharif aur Shehbaz Sharif ka nehayat mashkoor hain k Unhun ne hamein metro bus ka tuhfa Dya."
Ghar le jao, tbh, paisai wapis de do bas
 
.
Sir kia kah rahay ho ...yea Bus into arbon rupay mein bana daity hein pata nahi train kitnay karbo mein banayengay ...?
I know... I was only being practical, neglecting the corruption element... they would have easily exceeded the costs to over 300 billion rupees, had they wished for metro train... Pakistani politicians are really good in hiking the prices
 
.
Interesting... corruption main to hum India ko bhi peechay chor gaye hain... isi liye I have been advocating ke agar itna kharcha karna hai to thora sa aur kharcha kar ke metro train bana letay... warna aam roads pe 2 lanes add kar ke chotay chotay divider laga detay taa ke dosri cars is lane pe na aa jayen aur aise hi bus chala detay... halka phulka kharcha hota aur same service mil jaati

There are manythings where we can debate who is ahead India or Pakistan but the one thing that remains undisputable us that India is more corrupt than Pakistan
Zardaris corruption looks like kids stealing candy when compared to our Gandhi's
 
.
Interesting... corruption main to hum India ko bhi peechay chor gaye hain... isi liye I have been advocating ke agar itna kharcha karna hai to thora sa aur kharcha kar ke metro train bana letay... warna aam roads pe 2 lanes add kar ke chotay chotay divider laga detay taa ke dosri cars is lane pe na aa jayen aur aise hi bus chala detay... halka phulka kharcha hota aur same service mil jaati

As per figure Lahore Metro is not much expensive because in India we manufacture all from Buses to all transport & construction equipment & we have large construction giant who works in low margin but Islamabad Metro Bus is hell lot of expensive.
 
.
A jaw-dropping comparison that left you to only one question:
Will there be any accountability ever to these plunders in Pakistan, ever ?

Mubashir Luqman | Facebook

Yeh sub kehnay ki baaten hain. The comparison in figures is completely inaccurate. A comparison of costs/km of such projects will never be adequate without taking into consideration the overall design, length, outlay, utilities, purpose and geography of the city. By way of example jis 'khoobsurat Paris metro bus' ki baat ho ri hai, its infrastructure pales in comparison to the ISB-RWP metro. The Paris bus service does not have dedicated flyovers and underpasses and the service in large uses the existing road infrastructure on its daily routes hence its construction costs are obviously going to be much less.

These shoddy comparisons are nothing more than political propaganda. I want to see a proper comparison. Going to dismiss all such 'Mubashir Lucman' brain farts until then.

Just to give you a rough idea of how expensive dedicated metro infrastructure projects can be,as is often in the case of rail, which the existing ISB-RWP metro bus route can accommodate, here's a list:

Singapore Thomson MRT Line: not yet under construction, expected to open 2019-21,S$18 billion for 30 km. This is $600 million/km, all underground. Included only as a lower bound of costs; costs can rise beyond budget but rarely come significantly under it.

Hong Kong Sha Tin to Central Link: a 1-km segment underground (not underwater) is £270 million, under construction with opening expected in 2018. After converting to PPP using Hong Kong’s conversion rate this is $586 million/km.

Singapore Downtown MRT Line: under construction since around 2008, to be completed in 2017; S$20.7 billion for 42 km: $493 million/km. This line is fully underground. This represents a 70% cost overrun already, announced after I previously reported the original budget of S$12 billion.

Budapest Metro Line 4: under construction since 2006, completion expected in 2014, 400 billion forint for 7.4 km. This is $358 million per km. The line is fully underground.

Fukuoka, Nanakuma Line extension to Hakata: construction expected to begin 2014 with line opening expected in 2020, ¥45 billion for 1.4 km: $321 million/km. I do not know for certain that the extension is fully underground, but this is likely, as the preexisting line is underground and the extension follows busy CBD streets.

Cairo Metro Line 3, Phase 1: opened 2012 with construction since 2006, LE4.2 billion for4.3 km. This is $310 million/km. The phase is fully underground.

Kawasaki Subway: under construction, opening expected in 2018, ¥433.6 billion for 16.7 km: $260 million/km. The line is fully underground. Update: people in comments explain that the line was actually canceled; the link in this paragraph is just a plan.

Stockholm City Line: to open in 2017, 16.8 billion kronor (2007 prices) for 6 km of tunnel and 1.4 km of bridge: $259 million/km.

Sao Paulo Metro Line 6: construction due to begin in 2014; 7.8 billion reais for 15.9 km: $250 million/km. The line is 84% underground.

Sao Paulo Metro Line 4: construction began in 2004, first phase opened in 2010, completion expected in 2014; 5.6 billion reais for 12.8 km: $223 million/km. The line is fully underground.

Dnipropetrovsk Metro extension: under construction since about 2008, opening expected in 2015, €367 million for 4 km. After PPP conversion this is $214 million/km. It appears to be fully underground.

Malmö City Tunnel: built 2005-10, 9 billion kronor for 4.65 km: $212 million/km. This is a fully underground project.

San Juan Tren Urbano: built 1996-2004, $2.28 billion (2001 figures, see PDF-p. 145) for17.2 km: $163 million/km. The line is only 7.5% underground by direct inspection on Google Earth.

Lucern Zentralbahn: built 2008-13, CHF250 million for 1.32 km of tunnel: $151 million/km.

Hangzhou: I can’t find any ex post numbers, but in both 2005 and this year (Chinese) officials pegged the cost of future construction as ¥550 million/km: $145 million/km.

Sofia Metro Line 2: built 2008-12, €952 million for 17 km. After PPP conversion, this is $148 million/km. The line appears to be almost fully underground: the numbers here do not fully add up but point to 1.3-2.9 km above ground (7.6-13% of total line length) in one segment while Wikipedia’s line map shows only that segment with above-ground segments.

Thessaloniki: I can’t find any ex post numbers, but in 2005 the budget for the first phase, under construction to be opened in 2016, was €798 million for 9.6 km: $104 million/km. The second phase received bids last year and is expected to open in 2017, with an estimated cost of €518 million for 4.78 km: $135 million/km. Both phases are fully underground.

Vancouver Evergreen Line: under construction since 2012, completion expected 2016;C$1.4 billion for 11 km: $103 million/km. Only 2 km of the system, 18%, is underground, but Vancouver seems to have an unusually low underground construction cost premium.

Dubai Metro (lines 1 and 2): built 2005-11, Dh28 billion ($6.9 billion in PPP2010US$) for75 km: $92 million/km. Only 13 km of the system, 17%, is underground.

Mexico City Metro Line 12: built 2007-2012, $1.8 billion for 26.4 km. After PPP conversion, this is $90 million/km. From a Google Earth overlay map, this line is 49% underground.

Seoul Sin-Bundang Line: built 2005-11, 1,169 billion won for about 18 km (sources disagree on whether it’s 17.3 or 18.5): $87 million/km. The line is 100% underground according to YouTube videos.

Bangalore Metro, Phase 1: built 2006-11, 8,158 crore rupees for 42.3 km: $93 million/km. Only 8.82 km, or 21% of the project, is underground. See above for Indian construction costs in a heavier-tunneling setting.

Helsinki Westmetro: under construction since 2009 with completion expected in 2015, €714 million for 13.5 kilometers: $66 million/km. The line is fully underground.

Seoul Subway Line 9: opened 2009, 900 billion won for 27 km: $43 million/km. The line is almost fully underground by direct inspection on Google Maps.

Barcelona Sants-La Sagrera tunnel: built 2008-11, €179.3 million for 5.8 km: $39 million/km. This project is intercity but fully underground.
Comparative Subway Construction Costs, Revised | Pedestrian Observations
 
Last edited:
. .
Literary there is no alternative but to hang them all. Every night I watch their filthy faces and every time they come up with blunders they have no shame whatsoever for what they are saying. But its all our fault guys, we as a Nation are completely divided into sects, we will hang ourselves but will never come out on the roads against these bas*. I mean there is no one who could ago ahead and say ok I will do it, I will finish them all one by one or all together when they will be having a debate in a Parliament. We really need to finish them off for good. Every Pakistani who is sincere to his Country burns to death after watching the news everyday.
Anyway, I thought General Raheel Sharif is the man who will handcuff these bas* and will hang them later own. But, one thing I have learned after living in Pakistan for many years is that no matter how much you struggle for the betterment of this Country you will never be succeeded. Poor Imran Khan I literary feel sorry for him, its been 2 years now and he is struggling for justice just like my mother fighting for her right for the last 31 years.
 
.
Yeh sub kehnay ki baaten hain. The comparison in figures is completely inaccurate. A comparison of costs/km of such projects will never be adequate without taking into consideration the overall design, length, outlay, utilities, purpose and geography of the city. By way of example jis 'khoobsurat Paris metro bus' ki baat ho ri hai, its infrastructure pales in comparison to the ISB-RWP metro. The Paris bus service does not have dedicated flyovers and underpasses and the service in large uses the existing road infrastructure on its daily routes hence its construction costs are obviously going to be much less.

These shoddy comparisons are nothing more than political propaganda. I want to see a proper comparison. Going to dismiss all such 'Mubashir Lucman' brain farts until then.

Just to give you a rough idea of how expensive dedicated metro infrastructure projects can be,as is often in the case of rail, which the existing ISB-RWP metro bus route can accommodate, here's a list:

Singapore Thomson MRT Line: not yet under construction, expected to open 2019-21,S$18 billion for 30 km. This is $600 million/km, all underground. Included only as a lower bound of costs; costs can rise beyond budget but rarely come significantly under it.

Hong Kong Sha Tin to Central Link: a 1-km segment underground (not underwater) is £270 million, under construction with opening expected in 2018. After converting to PPP using Hong Kong’s conversion rate this is $586 million/km.

Singapore Downtown MRT Line: under construction since around 2008, to be completed in 2017; S$20.7 billion for 42 km: $493 million/km. This line is fully underground. This represents a 70% cost overrun already, announced after I previously reported the original budget of S$12 billion.

Budapest Metro Line 4: under construction since 2006, completion expected in 2014, 400 billion forint for 7.4 km. This is $358 million per km. The line is fully underground.

Fukuoka, Nanakuma Line extension to Hakata: construction expected to begin 2014 with line opening expected in 2020, ¥45 billion for 1.4 km: $321 million/km. I do not know for certain that the extension is fully underground, but this is likely, as the preexisting line is underground and the extension follows busy CBD streets.

Cairo Metro Line 3, Phase 1: opened 2012 with construction since 2006, LE4.2 billion for4.3 km. This is $310 million/km. The phase is fully underground.

Kawasaki Subway: under construction, opening expected in 2018, ¥433.6 billion for 16.7 km: $260 million/km. The line is fully underground. Update: people in comments explain that the line was actually canceled; the link in this paragraph is just a plan.

Stockholm City Line: to open in 2017, 16.8 billion kronor (2007 prices) for 6 km of tunnel and 1.4 km of bridge: $259 million/km.

Sao Paulo Metro Line 6: construction due to begin in 2014; 7.8 billion reais for 15.9 km: $250 million/km. The line is 84% underground.

Sao Paulo Metro Line 4: construction began in 2004, first phase opened in 2010, completion expected in 2014; 5.6 billion reais for 12.8 km: $223 million/km. The line is fully underground.

Dnipropetrovsk Metro extension: under construction since about 2008, opening expected in 2015, €367 million for 4 km. After PPP conversion this is $214 million/km. It appears to be fully underground.

Malmö City Tunnel: built 2005-10, 9 billion kronor for 4.65 km: $212 million/km. This is a fully underground project.

Bangalore Metro Phase 2: to be opened by 2017, 264 billion rupees for 72.1 km. This is $164 million/km. I do not know what proportion of the project is underground; it does not seem to be large, as the extension of the phase 1 lines are all outbound, and only line 4 seems to have significant tunneling, about 14 km by pure Wikipedia eyeballing.

San Juan Tren Urbano: built 1996-2004, $2.28 billion (2001 figures, see PDF-p. 145) for17.2 km: $163 million/km. The line is only 7.5% underground by direct inspection on Google Earth.

Lucern Zentralbahn: built 2008-13, CHF250 million for 1.32 km of tunnel: $151 million/km.

Hangzhou: I can’t find any ex post numbers, but in both 2005 and this year (Chinese) officials pegged the cost of future construction as ¥550 million/km: $145 million/km.

Sofia Metro Line 2: built 2008-12, €952 million for 17 km. After PPP conversion, this is $148 million/km. The line appears to be almost fully underground: the numbers here do not fully add up but point to 1.3-2.9 km above ground (7.6-13% of total line length) in one segment while Wikipedia’s line map shows only that segment with above-ground segments.

Thessaloniki: I can’t find any ex post numbers, but in 2005 the budget for the first phase, under construction to be opened in 2016, was €798 million for 9.6 km: $104 million/km. The second phase received bids last year and is expected to open in 2017, with an estimated cost of €518 million for 4.78 km: $135 million/km. Both phases are fully underground.

Vancouver Evergreen Line: under construction since 2012, completion expected 2016;C$1.4 billion for 11 km: $103 million/km. Only 2 km of the system, 18%, is underground, but Vancouver seems to have an unusually low underground construction cost premium.

Dubai Metro (lines 1 and 2): built 2005-11, Dh28 billion ($6.9 billion in PPP2010US$) for75 km: $92 million/km. Only 13 km of the system, 17%, is underground.

Mexico City Metro Line 12: built 2007-2012, $1.8 billion for 26.4 km. After PPP conversion, this is $90 million/km. From a Google Earth overlay map, this line is 49% underground.

Seoul Sin-Bundang Line: built 2005-11, 1,169 billion won for about 18 km (sources disagree on whether it’s 17.3 or 18.5): $87 million/km. The line is 100% underground according to YouTube videos.

Bangalore Metro, Phase 1: built 2006-11, 8,158 crore rupees for 42.3 km: $93 million/km. Only 8.82 km, or 21% of the project, is underground. See above for Indian construction costs in a heavier-tunneling setting.

Helsinki Westmetro: under construction since 2009 with completion expected in 2015, €714 million for 13.5 kilometers: $66 million/km. The line is fully underground.

Seoul Subway Line 9: opened 2009, 900 billion won for 27 km: $43 million/km. The line is almost fully underground by direct inspection on Google Maps.

Barcelona Sants-La Sagrera tunnel: built 2008-11, €179.3 million for 5.8 km: $39 million/km. This project is intercity but fully underground.
Comparative Subway Construction Costs, Revised | Pedestrian Observations
I really appreciate your detailed response ...you have come up with some real facts and figures ...How much government has to pay from the national exchequer to keep Metro going per anum ?
 
. .
Yeh sub kehnay ki baaten hain. The comparison in figures is completely inaccurate. A comparison of costs/km of such projects will never be adequate without taking into consideration the overall design, length, outlay, utilities, purpose and geography of the city. By way of example jis 'khoobsurat Paris metro bus' ki baat ho ri hai, its infrastructure pales in comparison to the ISB-RWP metro. The Paris bus service does not have dedicated flyovers and underpasses and the service in large uses the existing road infrastructure on its daily routes hence its construction costs are obviously going to be much less.

These shoddy comparisons are nothing more than political propaganda. I want to see a proper comparison. Going to dismiss all such 'Mubashir Lucman' brain farts until then.

Just to give you a rough idea of how expensive dedicated metro infrastructure projects can be,as is often in the case of rail, which the existing ISB-RWP metro bus route can accommodate, here's a list:

Singapore Thomson MRT Line: not yet under construction, expected to open 2019-21,S$18 billion for 30 km. This is $600 million/km, all underground. Included only as a lower bound of costs; costs can rise beyond budget but rarely come significantly under it.

Hong Kong Sha Tin to Central Link: a 1-km segment underground (not underwater) is £270 million, under construction with opening expected in 2018. After converting to PPP using Hong Kong’s conversion rate this is $586 million/km.

Singapore Downtown MRT Line: under construction since around 2008, to be completed in 2017; S$20.7 billion for 42 km: $493 million/km. This line is fully underground. This represents a 70% cost overrun already, announced after I previously reported the original budget of S$12 billion.

Budapest Metro Line 4: under construction since 2006, completion expected in 2014, 400 billion forint for 7.4 km. This is $358 million per km. The line is fully underground.

Fukuoka, Nanakuma Line extension to Hakata: construction expected to begin 2014 with line opening expected in 2020, ¥45 billion for 1.4 km: $321 million/km. I do not know for certain that the extension is fully underground, but this is likely, as the preexisting line is underground and the extension follows busy CBD streets.

Cairo Metro Line 3, Phase 1: opened 2012 with construction since 2006, LE4.2 billion for4.3 km. This is $310 million/km. The phase is fully underground.

Kawasaki Subway: under construction, opening expected in 2018, ¥433.6 billion for 16.7 km: $260 million/km. The line is fully underground. Update: people in comments explain that the line was actually canceled; the link in this paragraph is just a plan.

Stockholm City Line: to open in 2017, 16.8 billion kronor (2007 prices) for 6 km of tunnel and 1.4 km of bridge: $259 million/km.

Sao Paulo Metro Line 6: construction due to begin in 2014; 7.8 billion reais for 15.9 km: $250 million/km. The line is 84% underground.

Sao Paulo Metro Line 4: construction began in 2004, first phase opened in 2010, completion expected in 2014; 5.6 billion reais for 12.8 km: $223 million/km. The line is fully underground.

Dnipropetrovsk Metro extension: under construction since about 2008, opening expected in 2015, €367 million for 4 km. After PPP conversion this is $214 million/km. It appears to be fully underground.

Malmö City Tunnel: built 2005-10, 9 billion kronor for 4.65 km: $212 million/km. This is a fully underground project.

Bangalore Metro Phase 2: to be opened by 2017, 264 billion rupees for 72.1 km. This is $164 million/km. I do not know what proportion of the project is underground; it does not seem to be large, as the extension of the phase 1 lines are all outbound, and only line 4 seems to have significant tunneling, about 14 km by pure Wikipedia eyeballing.

San Juan Tren Urbano: built 1996-2004, $2.28 billion (2001 figures, see PDF-p. 145) for17.2 km: $163 million/km. The line is only 7.5% underground by direct inspection on Google Earth.

Lucern Zentralbahn: built 2008-13, CHF250 million for 1.32 km of tunnel: $151 million/km.

Hangzhou: I can’t find any ex post numbers, but in both 2005 and this year (Chinese) officials pegged the cost of future construction as ¥550 million/km: $145 million/km.

Sofia Metro Line 2: built 2008-12, €952 million for 17 km. After PPP conversion, this is $148 million/km. The line appears to be almost fully underground: the numbers here do not fully add up but point to 1.3-2.9 km above ground (7.6-13% of total line length) in one segment while Wikipedia’s line map shows only that segment with above-ground segments.

Thessaloniki: I can’t find any ex post numbers, but in 2005 the budget for the first phase, under construction to be opened in 2016, was €798 million for 9.6 km: $104 million/km. The second phase received bids last year and is expected to open in 2017, with an estimated cost of €518 million for 4.78 km: $135 million/km. Both phases are fully underground.

Vancouver Evergreen Line: under construction since 2012, completion expected 2016;C$1.4 billion for 11 km: $103 million/km. Only 2 km of the system, 18%, is underground, but Vancouver seems to have an unusually low underground construction cost premium.

Dubai Metro (lines 1 and 2): built 2005-11, Dh28 billion ($6.9 billion in PPP2010US$) for75 km: $92 million/km. Only 13 km of the system, 17%, is underground.

Mexico City Metro Line 12: built 2007-2012, $1.8 billion for 26.4 km. After PPP conversion, this is $90 million/km. From a Google Earth overlay map, this line is 49% underground.

Seoul Sin-Bundang Line: built 2005-11, 1,169 billion won for about 18 km (sources disagree on whether it’s 17.3 or 18.5): $87 million/km. The line is 100% underground according to YouTube videos.

Bangalore Metro, Phase 1: built 2006-11, 8,158 crore rupees for 42.3 km: $93 million/km. Only 8.82 km, or 21% of the project, is underground. See above for Indian construction costs in a heavier-tunneling setting.

Helsinki Westmetro: under construction since 2009 with completion expected in 2015, €714 million for 13.5 kilometers: $66 million/km. The line is fully underground.

Seoul Subway Line 9: opened 2009, 900 billion won for 27 km: $43 million/km. The line is almost fully underground by direct inspection on Google Maps.

Barcelona Sants-La Sagrera tunnel: built 2008-11, €179.3 million for 5.8 km: $39 million/km. This project is intercity but fully underground.
Comparative Subway Construction Costs, Revised | Pedestrian Observations


Your not considered the Delhi Metro Phase-3,

Phase-3 is mostly undergrounded ,

Constructed at rate of $33.47 million per KM.
Moreover,
Coming soon: Driver-less Metro - The Hindu
 
.
Yeh sub kehnay ki baaten hain. The comparison in figures is completely inaccurate. A comparison of costs/km of such projects will never be adequate without taking into consideration the overall design, length, outlay, utilities, purpose and geography of the city. By way of example jis 'khoobsurat Paris metro bus' ki baat ho ri hai, its infrastructure pales in comparison to the ISB-RWP metro. The Paris bus service does not have dedicated flyovers and underpasses and the service in large uses the existing road infrastructure on its daily routes hence its construction costs are obviously going to be much less.

These shoddy comparisons are nothing more than political propaganda. I want to see a proper comparison. Going to dismiss all such 'Mubashir Lucman' brain farts until then.

Just to give you a rough idea of how expensive dedicated metro infrastructure projects can be,as is often in the case of rail, which the existing ISB-RWP metro bus route can accommodate, here's a list:

Singapore Thomson MRT Line: not yet under construction, expected to open 2019-21,S$18 billion for 30 km. This is $600 million/km, all underground. Included only as a lower bound of costs; costs can rise beyond budget but rarely come significantly under it.

Hong Kong Sha Tin to Central Link: a 1-km segment underground (not underwater) is £270 million, under construction with opening expected in 2018. After converting to PPP using Hong Kong’s conversion rate this is $586 million/km.

Singapore Downtown MRT Line: under construction since around 2008, to be completed in 2017; S$20.7 billion for 42 km: $493 million/km. This line is fully underground. This represents a 70% cost overrun already, announced after I previously reported the original budget of S$12 billion.

Budapest Metro Line 4: under construction since 2006, completion expected in 2014, 400 billion forint for 7.4 km. This is $358 million per km. The line is fully underground.

Fukuoka, Nanakuma Line extension to Hakata: construction expected to begin 2014 with line opening expected in 2020, ¥45 billion for 1.4 km: $321 million/km. I do not know for certain that the extension is fully underground, but this is likely, as the preexisting line is underground and the extension follows busy CBD streets.

Cairo Metro Line 3, Phase 1: opened 2012 with construction since 2006, LE4.2 billion for4.3 km. This is $310 million/km. The phase is fully underground.

Kawasaki Subway: under construction, opening expected in 2018, ¥433.6 billion for 16.7 km: $260 million/km. The line is fully underground. Update: people in comments explain that the line was actually canceled; the link in this paragraph is just a plan.

Stockholm City Line: to open in 2017, 16.8 billion kronor (2007 prices) for 6 km of tunnel and 1.4 km of bridge: $259 million/km.

Sao Paulo Metro Line 6: construction due to begin in 2014; 7.8 billion reais for 15.9 km: $250 million/km. The line is 84% underground.

Sao Paulo Metro Line 4: construction began in 2004, first phase opened in 2010, completion expected in 2014; 5.6 billion reais for 12.8 km: $223 million/km. The line is fully underground.

Dnipropetrovsk Metro extension: under construction since about 2008, opening expected in 2015, €367 million for 4 km. After PPP conversion this is $214 million/km. It appears to be fully underground.

Malmö City Tunnel: built 2005-10, 9 billion kronor for 4.65 km: $212 million/km. This is a fully underground project.

Bangalore Metro Phase 2: to be opened by 2017, 264 billion rupees for 72.1 km. This is $164 million/km. I do not know what proportion of the project is underground; it does not seem to be large, as the extension of the phase 1 lines are all outbound, and only line 4 seems to have significant tunneling, about 14 km by pure Wikipedia eyeballing.

San Juan Tren Urbano: built 1996-2004, $2.28 billion (2001 figures, see PDF-p. 145) for17.2 km: $163 million/km. The line is only 7.5% underground by direct inspection on Google Earth.

Lucern Zentralbahn: built 2008-13, CHF250 million for 1.32 km of tunnel: $151 million/km.

Hangzhou: I can’t find any ex post numbers, but in both 2005 and this year (Chinese) officials pegged the cost of future construction as ¥550 million/km: $145 million/km.

Sofia Metro Line 2: built 2008-12, €952 million for 17 km. After PPP conversion, this is $148 million/km. The line appears to be almost fully underground: the numbers here do not fully add up but point to 1.3-2.9 km above ground (7.6-13% of total line length) in one segment while Wikipedia’s line map shows only that segment with above-ground segments.

Thessaloniki: I can’t find any ex post numbers, but in 2005 the budget for the first phase, under construction to be opened in 2016, was €798 million for 9.6 km: $104 million/km. The second phase received bids last year and is expected to open in 2017, with an estimated cost of €518 million for 4.78 km: $135 million/km. Both phases are fully underground.

Vancouver Evergreen Line: under construction since 2012, completion expected 2016;C$1.4 billion for 11 km: $103 million/km. Only 2 km of the system, 18%, is underground, but Vancouver seems to have an unusually low underground construction cost premium.

Dubai Metro (lines 1 and 2): built 2005-11, Dh28 billion ($6.9 billion in PPP2010US$) for75 km: $92 million/km. Only 13 km of the system, 17%, is underground.

Mexico City Metro Line 12: built 2007-2012, $1.8 billion for 26.4 km. After PPP conversion, this is $90 million/km. From a Google Earth overlay map, this line is 49% underground.

Seoul Sin-Bundang Line: built 2005-11, 1,169 billion won for about 18 km (sources disagree on whether it’s 17.3 or 18.5): $87 million/km. The line is 100% underground according to YouTube videos.

Bangalore Metro, Phase 1: built 2006-11, 8,158 crore rupees for 42.3 km: $93 million/km. Only 8.82 km, or 21% of the project, is underground. See above for Indian construction costs in a heavier-tunneling setting.

Helsinki Westmetro: under construction since 2009 with completion expected in 2015, €714 million for 13.5 kilometers: $66 million/km. The line is fully underground.

Seoul Subway Line 9: opened 2009, 900 billion won for 27 km: $43 million/km. The line is almost fully underground by direct inspection on Google Maps.

Barcelona Sants-La Sagrera tunnel: built 2008-11, €179.3 million for 5.8 km: $39 million/km. This project is intercity but fully underground.
Comparative Subway Construction Costs, Revised | Pedestrian Observations

You are giving example of mostly underground metro rail project.
This is Metro bus.
 
.
Corruption is not prevalent alone in political leadership of the India and Pakistan alone, its now in the psyche of general public too. It has very strong roots in the sub continent from top end to low end
 
.
Back
Top Bottom