Did u even read the article? It is exactly saying what I was saying. PMLN did a blunder by investing so much in expensive power plants and not in transmission which was the actual issues. Below are the extracts of article shared by you:
View attachment 672059
If you try to put it on growth rate then the maximum impact of this for 2 years cant be no more than 8%. 6% of 24,000 is 1,920 which means still excess capacity of 11,000 MW.
On the top of this due to transmission infrastructure shortage we still have load shedding specially in Karachi. What a planning done by PMLN.