China Pakistan Economic Corridor (CPEC) | Power Plants

Indonesia Offers Coal For CPEC Power Projects

Pakistan Adam M Tugio, the Indonesian coal sector is well-developed, and the country can supply coal to Pakistan for power projects under the China Pakistan Economic Corridor (CPEC).

The ambassador added during a meeting with businessmen in Lahore that his country could also supply coal to the domestic large-scale manufacturing industry.

The meeting was aimed at fostering bilateral cooperation and increasing Pakistan’s imports of Indonesian coal. He also stated that the Pakistani government was devoting special attention to the development of infrastructure and energy schemes as part of the CPEC, with coal being a major component of the energy projects.
 
.
..

884MW - Suki Kinari HPP- under construction....


The construction activities are in progress with severe weather conditions. The civil and electro-mechanical works are going on.
The construction activities were started in 2017 and expected completion date of the project is Dec, 2022..


1643896700366.png




1643896722655.png




1643896740309.png
 
. .
The test run of two 900MW power plants, Lucky and Thar Energy Ltd has paved the way for the launch of their commercial operations.

At present, the power plants of the Southern region include
China Hub with 1,240 MW, E
ngro Thar with 600 MW,
Port Qasim with 1,250 MW,
Wind Energy Plants with 200 MW,
K-2 with 1,040 MW,
and Hubco with 300 MW of electricity are operational.

From this system, 1,500 MW of electricity is being used by Sindh, 500 MW of electricity is benefiting Hyderabad Electric Supply Company and 1,000 MW of electricity is being used by K-Electric. 3,130 MW of electricity is being supplied to north-urban centers of Punjab.

According to the sources, as soon as the generation touches the figure of 400 MW, the testing of 660 kV Martiari-Lahore High Voltage Direct Current transmission line would be carried out on full load/installed...
 
. .
Dasu Hydropower Project - DHPP

February 10, 2022:.... Special monitoring team of Ministry of Planning Development and Special Initiative, Planning Commission visited various parts of Dasu Pin Electricity Project.

The officers of the monitoring team held briefing regarding the ongoing construction activities on various compo points of the Dasu Pin Electricity Project. Monitoring officers Majid Mustafa and Mohush Ros were involved in the special monitoring team of the Planning Commission.

The planning commission delegation also visited the main dam works and under construction Wapda Chuching Colony.

The planning commission team gave a chance to visit the site. Had a detailed meeting with M/Project Director Dasu Pin Electricity Project Mr. Nawar ul Haq in which the delegation was briefed on the speed and progress of work on various parts of the project.


1644610139383.png



1644610158576.png



1644610186563.png
 
. . .
Diamer Basha Dam 4500MW - Under Construction

The Construction works were commenced in July 2020 on this monumental project. InshAllah, on completion, this dam will reduce water scarcity and also address power woes of the country.


1645024765650.png




1645024789331.png




1645024817262.png
 
.
Update on 800 MW Under Construction Mohmand Dam. Work is being done simultaneously on nine different sites. It could be operational by 2025.


1645139457828.png




1645139480536.png
 
.
Another milestone was achieved on 19th Feb, 2022 at Suki Kinari Hydropower Project.
247m deep lower pressure shaft (PS1) has been completed successfully and provides space for subsequent steel lining works. Out of 6 pressure shafts, the 04 pressure shafts had already been completed.


1645464561684.png



1645464582699.png
 
.
World's highest roller compacted concrete dam Diamer Bhasha Dam.

Wapda is building a project on the Sindh River Dam on the Damir Bhasha Dam which is to be completed in 2028-29. Continuous work is being done day and night at the Damir Bhasha Dam so that this project can be completed as soon as possible and made available for public interest.

The project will have the capacity to store 8.1 million acres of total water to plow 1.23 million acres of additional land which will revolutionize the agriculture sector.

With 4,500 MW electricity production capacity, the project will provide the National Grid with more than 18 billion units annually, which will not only replace Pakistan but also help to eradicate problems like load shedding in Pakistan, which will help Pakistani industries. There will also be benefit.

The construction of the Damir Bhasha Dam will also have a positive impact on the annual energy production of current Hydal power stations including Tarbela, Ghazi Brotha etc. which will increase an additional 2.5 billion units.


1645626519670.png
 
. .
Hydro power project to be built in Kaghan valley of Mansehra district of Saki Kanari Khyber Pakhtunkhwa district. This project, which will be completed in 2022 will generate 884 MW electricity which will focus on Pakistan's industrial development and economic recovery.


1645722141654.png




1645722164949.png




1645722184528.png
 
. .