Bilal Khan (Quwa)
SENIOR MEMBER
- Joined
- Aug 22, 2016
- Messages
- 7,004
- Reaction score
- 97
- Country
- Location
IMO ... if the PAF opts to bring in new aerostructures for the Mirage III/5s, then that alone is telling: no new fighter (besides Block-III/JF-17B) until Project AZM. If not (and the upgrade is mostly electronics and new munitions), then things are still in the grey.Yes zero hour wings were supplied by Atlas; i am sure more have made their way over as well.
Reassembling is being done there without doubt. But what we are speaking is the actual fabrication of the entire wing as well airframes. Wings at Atlas under go a rigorous stress test prior to being dismantled and packaged for shipment.
Only for today Araz. Back on duty for next few weeks before being rolled off. The Covid situation been devastating here; on top we have a few renegade idiots via various electronic media disseminating bs; tracing the flipping source and getting resource to nab these guys for a good haircut in the slammer. complete prep for any riot situation etc.
It is good to see what is being done for the M3/M5. the radio upgrades are from my company on the M3/M5. and most likely a datalink may be there too.