araz
PDF THINK TANK: CONSULTANT
- Joined
- Jun 14, 2006
- Messages
- 9,291
- Reaction score
- 81
Integrating squadrons into the system at such pace is not possible for PAF. Plus there is planned integration of squadrons based on when planes are due to be phased out and when infrastructure for maintenance can be setup locally. I think finances are the main reason for this although there maybe other technical glitches that we may not be aware of which is why PAC is taking it slowly with the block 3.Our production rate of Block 3 is very low, we should have 35 to 50 block 3 by 2025. Replacing 5 squadrons of Mirage with JF-17 in 5 years is impossible.
A